British Swim School of Edmonton - Lane Pool B
101 - 4202 Parkwest Place Stony Plain AB T7Z 0N1 · Aquatic Facility
7 inspections
- Risk Management Inspection
1 infraction
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- The pool pump/circulation system was turned off at time of inspection due to an issue with the heater not heating the pool water.Ensure a re-inspection is booked with AHS prior to opening this pool.
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Bacteriological water sample collected on Feb 18, 2026, showed the HPC count is 2860 CFU/mL.Pool operator said the pool is not being used currently due to a water heater issue. Operators will continue to submit samples weekly.
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- The pool pump/circulation system was turned off at time of inspection due to an issue with the heater not heating the pool water.Ensure a re-inspection is booked with AHS prior to opening this pool.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
1 infraction
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- The pool pump/circulation system was turned off at time of inspection due to an issue with the heater not heating the pool water.Ensure a re-inspection is booked with AHS prior to opening this pool.
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- Risk Management Inspection
0 infractions
- Initial Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total alkalinity was measured at 59ppm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
0 infractions
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- The HPC count from sample collected December 22, 2025, was at 590 CFU/mL.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?