Skip to content
Loading map…

Park Place II - Pool

570 Park Ave West, Chatham ON N7M 1X2 · Outdoor class B pool

9 inspections

  1. Follow-up

    0 infractions

  2. Required

    2 infractions

    • Operator demonstrates satisfactory attendance at the facility to ensure safe operation. s.26.5
      • Operator must demonstrate satisfactory attendance at the facility and must regularly record the results of inspections of safety-related equipment present
    • Manual testing conducted 1/2 hour before opening and every 2 hours during the daily use period for pools without automatic sensing devices (pH, FAC, total chlorine or Br, total alkalinity, water clarity); s.7(12)
  3. Follow-up

    0 infractions

  4. Required

    3 infractions

    • All circulation equipment and chemical feeders operate continuously s.6(3)(d)
      • Ensure there is continuous operation of all equipment and chemical feeders
    • Daily records completed and signed s.8
      • Complete and sign records daily
      • Record any emergencies, rescues or breakdowns of equipment
      • Record Cl (free and total) residual 1/2 hour before opening & every 4 hours while pool is open
      • Record pH 1/2 hour before opening & every 4 hours while pool is open
      • Record total alkalinity 1/2 hour before opening and every 4 hours while pool is open
      • Record water clarity 1/2 hour before opening and every 4 hours while pool is open
      • Record reading of the make-up water meter
      • Record time of day for testing of emergency telephone
      • Record time of day for testing of ground fault detector
      • Record total number of bathers admitted to pool each day
      • Record the type and amount of any chemicals added manually
    • Records retained for one year s.9
  5. Required

    4 infractions

    • Exposed piping within pool enclosure is properly colour-coded s.6(6)(p)
      • Ensure exposed piping is painted or colour-coded with bands at least 25mm wide, at intervals no greater than 1.2 m (chlorine - yellow, potable water - green)
    • pH is within range of 7.2 to 7.8 s.7(8)(b)
      • Maintain pH between 7.2 to 7.8
    • Manual testing conducted 1/2 hour before opening and every 4 hours during the daily use period for pools with automatic sensing devices (pH, FAC, total chlorine or Br, total alkalinity, water clarity); s.7(12)
      • Ensure manual testing is conducted every 4 hours during the daily use period
    • Daily records completed and signed s.8
      • Complete and sign records daily
      • Record Cl (free and total) residual 1/2 hour before opening & every 4 hours while pool is open
      • Record pH 1/2 hour before opening & every 4 hours while pool is open
      • Record total alkalinity 1/2 hour before opening and every 4 hours while pool is open
      • Record water clarity 1/2 hour before opening and every 4 hours while pool is open
      • Record time of day for testing of emergency telephone
      • Record the type and amount of any chemicals added manually
  6. Required

    2 infractions

    • Manual testing conducted 1/2 hour before opening and every 4 hours during the daily use period for pools with automatic sensing devices (pH, FAC, total chlorine or Br, total alkalinity, water clarity); s.7(12)
      • Ensure manual testing is conducted every 4 hours during the daily use period
    • Daily records completed and signed s.8
      • Complete and sign records daily
      • Record any emergencies, rescues or breakdowns of equipment
      • Record Cl (free and total) residual 1/2 hour before opening & every 4 hours while pool is open
      • Record pH 1/2 hour before opening & every 4 hours while pool is open
      • Record total alkalinity 1/2 hour before opening and every 4 hours while pool is open
      • Record water clarity 1/2 hour before opening and every 4 hours while pool is open
      • Record time of day for testing of emergency telephone
      • Record the type and amount of any chemicals added manually
  7. Required

    4 infractions

    • Exposed piping within pool enclosure is properly colour-coded s.6(6)(p)
      • Ensure exposed piping is painted or colour-coded with bands at least 25mm wide, at intervals no greater than 1.2 m (chlorine - yellow, potable water - green)
    • Total alkalinity within the range of 80 mg/L (80ppm) and 120 mg/L (120ppm) s.7(8)(a)
      • Maintain total alkalinity within the range of 80 mg/L (80ppm) and 120 mg/L (120ppm)
    • Pool Rules notices displayed with complete information s.19(1)
      • Ensure at least two "Pool Rules" notices are displayed
    • Admission Standards "Important Notice" posted at entrance and two other locations within pool enclosure
      • Ensure the admission standards "Important Notice" is posted at the pool entrance
      • Ensure the admission standards "Important Notice" is posted in two locations in the pool
  8. Required

    0 infractions

  9. Required

    1 infraction

    • Depth markings present in appropriate locations s.19(6)
      • Ensure depth markings are maintained and clearly visible
      • Ensure figures are marked not less than 100 mm high
      • Ensure markings are indicated at the appropriate locations
      • Provide markings that indicate "SHALLOW AREA"
      • Provide markings that indicate breaks between gentle and steep bottom slopes
      • Provide markings that indicate deep points
      • Provide markings that indicate shallow points