Aller au contenu
Chargement de la carte…

NAMASTE CHARTER SCHOOL

3737 S PAULINA ST, CHICAGO, IL 60609 · School

8 inspections

  1. Toiles

    0 infraction

  2. Toiles

    2 infractions

    • 10. AIDE À L ' AGRICULTURE PROFESSIONNELLE ET ACCESSIBLE
      • OBSERVED MISSING HANDWASHING SIGNAGE IN ALL EMPLOYEE, BOYS, AND GIRLS' RESTROOMS ON BASEMENT, FIRST, SECOND, AND THIRD FLOORS. INSTRUCTED TO PROVIDE AND MAINTAIN.
    • 55. FACILITÉS PHYSIQUES INSTALLÉES, PRINCIPALES ET CLÉS
      • OBSERVED DUST BUILDUP AT WINDOW BEHIND STORAGE AREA IN MAIN KITCHEN. INSTRUCTED MANAGER TO CLEAN MAINTAIN.
  3. Toiles

    2 infractions

    • 51. PLAQUEMENT INSTALLÉ; DISPOSITIFS DE RENFORCEMENT
      • OBSERVED SMALL LEAK AT BOYS WASHROOM HANDSINK ON SECOND FLOOR(CLOSEST TO URINALS). INSTRUCTED PERSON IN CHARGE REPAIR AND MAINTAIN.
    • 55. FACILITÉS PHYSIQUES INSTALLÉES, PRINCIPALES ET CLÉS
      • OBSERVED CONTAINERS STORED ON FLOOR IN CAFETERIA PREP AREA. INSTRUCTED PERSON IN CHARGE TO ELEVATE ALL ITEMS AT LEAST SIX INCHES FROM FLOOR FOR THE PREVENTION OF PEST HARBORAGE.
  4. Réinspection des toiles

    0 infraction

  5. Toiles

    2 infractions

    • 56. VENTILATION ADEQUATE ET LIGHTING; ZONES DÉSIGNÉES UTILISÉES
      • MUST REPLACE BURNTOUT LIGHT IN KITCHEN.
    • 60. VIOLATION PRÉCÉDENTE DE LA BASE
      • PREVIOUS CORE VIOLATION FROM REPORT #2352814 12/6/2019 NOT CORRECTED OBSERVED AN OVEN BEING USED WITHOUT VENTILATION. INSTRUCTED TO INSTALL PROPER VENTILATION ABOVE THE OVEN AND MAINTAIN.(PRIORITY FOUNDATION 7-42-090)
  6. Toiles

    1 infraction

    • 56. VENTILATION ADEQUATE ET LIGHTING; ZONES DÉSIGNÉES UTILISÉES
      • OBSERVED AN OVEN BEING USED WITHOUT VENTILATION. INSTRUCTED TO INSTAMM PROPER VENTILATION ABOVE THE OVEN AND MAINTAIN
  7. Toiles

    3 infractions

    • 51. PLAQUEMENT INSTALLÉ; DISPOSITIFS DE RENFORCEMENT
      • Observed the following plumbing issued in student restrooms: Left washbowl sink with low hot water pressure in BSMT girls restroom; No hot water available at all washbowl sinks and 4th urinal from the left in disrepair (out of order due to gasket issue) in boys 1st restroom; Right washbowl sink (on east side of restroom) does not have hot water and large stall toilet in disrepair in girls 2nd floor restroom; Low hot water pressure in all washbowl sinks in boys 3rd floor restroom. Must make all necessary repairs. Must maintain same.
    • 55. FACILITÉS PHYSIQUES INSTALLÉES, PRINCIPALES ET CLÉS
      • Observed porous raw wood shelving in dry storage room. Must seal or paint to make surface non-porous, smooth and easily cleanable. Must maintain same.
    • 55. FACILITÉS PHYSIQUES INSTALLÉES, PRINCIPALES ET CLÉS
      • Observed hole above wall outlet in cafeteria. Must seal to prevent pest entry. Must maintain same.
  8. Toiles

    5 infractions

    • 33. ÉQUIPEMENT DE CONTACT POUR LES ALIMENTS ET LES NON FOURNISSEURS UTENSILS LIBRE DE DÉTERGENTS ABRASIFS
      • MUST DETAIL CLEAN INTERIOR PANEL OF ICE MACHINE IN PREP/KITCHEN AREA.
    • 34. FLEURS: CONSTRUCTES PAR CODE, CLÉS, BONNES RÉPARATIONS, INSTALLÉES EN VUE, MÉTHODES DE CLASSEMENT DE L'ÉCRAN DE DÉSUS UTILISÉES
      • MUST DETAIL CLEAN DEBRIS FROM FLOORS THROUGHOUT KITCHEN/PREP AREA.
    • 35. ÉQUIPEMENT CONSTRUCTE PAR CODE: BONNE RÉPARATION, SURFACES ET MÉTHODES DE CLASSEMENT DE L ' EAU
      • MUST REPAIR PEELING CEILING PAINT IN GIRLS 1ST FLOOR AND BASEMENT TOILET ROOMS. ALSO, REPAIR PEELING WALL PAINT IN 3RD FLOOR BOYS TOILET ROOM.
    • 36. LUTTE CONTRE L ' ÉCLAIRAGE : CANDIDATS MINIMAUX EXIGÉS DE LUMIÈRE PROVIDÉE, FIXTURES
      • REPLACE BURNED OUT LIGHT IN BOYS TOILET ROOM IN BASEMENT AND IN STAFF TOILET ROOM ON 2ND FLOOR.
    • 38. VENTILATION: CHAMBRES ET ÉQUIPEMENTS VENTUELS DE LA DEMANDE:
      • MUST REPAIR LEAKY PIPE UNDER 3-COMP SINK IN KITCHEN/PREP AREA. INCREASE HOT WATER PRESSURE AT ALL HANDS SINKS IN BOYS TOILET ROOM ON 1ST FLOOR.