  1. Risk Management Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The water level was at the level of the two skimmers at the East end of the pool. However, the water level was above the two skimmers at the West end of the pool.Corrective Action:Adjust and maintain the water level at the level of skimmers to ensure adequate skimming action and surface recirculation.
  2. Monitoring Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • A hose was left in the pool, overfilling the basin. The water level was above the skimmers.Corrective Action:Adjust and maintain the water level at the skimmers to ensure adequate surface recirculation.
  3. Risk Management Inspection

    0 infractions

  4. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The microbiological water sample submitted on January 28, 2025, was unsatisfactory: HPC 250 CFU/mL. Take all necessary action to ensure microbiologically safe water. Submit a new microbiological water sample at your earliest convenience once the water chemistry is balanced.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • 29 Feb 2024; The turnover period was 6.29 hours based on a flow rate of 105GPM. 9 Jan 2023; The turnover period was 6.29 hours based on a flow rate of 105GPM. Adjust the flow rate to between 110GPM and 115GPM to allow for a turnover period of less t6 hours or less.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The turnover period was 7.3 hours. A minimum flow rate of 110GPM is required to achieve a 6 hour turnover period
  5. Risk Management Inspection

    4 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • 29 Feb 2024; The turnover period was 6.29 hours based on a flow rate of 105GPM. 9 Jan 2023; The turnover period was 6.29 hours based on a flow rate of 105GPM. Adjust the flow rate to between 110GPM and 200GPM to allow for a turnover period of less t6 hours or less.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The turnover period was 7.3 hours. A minimum flow rate of 110GPM is required to achieve a 6 hour turnover period
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The pool pilot indicator light was flashing red with an error message to "Add Salt"
    • 12. Are the general safety devices and physical conditions in this pool providing a safe environment (Critical)?
      • Aquastar A10RCFR101 suction outlet covers were non-compliant. The maximum pump flow (150GPM) exceeds the maximum approved outlet cover flow of 119GPM. To achieve compliance, new suction outlet covers with higher flow ratings need to be installed.
  6. Monitoring Inspection

    4 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • 29 Feb 2024; The turnover period was 6.29 hours based on a flow rate of 105GPM. 9 Jan 2023; The turnover period was 6.29 hours based on a flow rate of 105GPM. Adjust the flow rate to between 110GPM and 200GPM to allow for a turnover period of less t6 hours or less.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The turnover period was 7.3 hours. A minimum flow rate of 110GPM is required to achieve a 6 hour turnover period
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The pool pilot indicator light was flashing red with an error message to "Add Salt"
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Updated Anti-entrapment plan was not available to be reviewed onsite.Update anti-entrapment plan and email copy of update anti-entrapment plan to the undersigned.
  7. Risk Management Inspection

    2 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • 29 Feb 2024; The turnover period was 6.29 hours based on a flow rate of 105GPM. 9 Jan 2023; The turnover period was 6.29 hours based on a flow rate of 105GPM. Adjust the flow rate to between 110GPM and 200GPM to allow for a turnover period of less t6 hours or less.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Updated Anti-entrapment plan was not available to be reviewed onsite.Update anti-entrapment plan and email copy of update anti-entrapment plan to the undersigned.
  8. Demand Inspection

    3 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • The microbiological water sample submitted on December 31, 2024, was unsatisfactory: Total Coliforms isolated. Take all necessary action to ensure microbiologically safe water. Submit a new microbiological water sample at your earliest convenience once the water chemistry is balanced.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • 29 Feb 2024; The turnover period was 6.29 hours based on a flow rate of 105GPM. 9 Jan 2023; The turnover period was 6.29 hours based on a flow rate of 105GPM. Adjust the flow rate to between 110GPM and 200GPM to allow for a turnover period of less t6 hours or less.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Updated Anti-entrapment plan was not available to be reviewed onsite.Update anti-entrapment plan and email copy of update anti-entrapment plan to the undersigned.
  9. Monitoring Inspection

    2 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • 29 Feb 2024; The turnover period was 6.29 hours based on a flow rate of 105GPM. 9 Jan 2023; The turnover period was 6.29 hours based on a flow rate of 105GPM. Adjust the flow rate to between 110GPM and 200GPM to allow for a turnover period of less t6 hours or less.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Updated Anti-entrapment plan was not available to be reviewed onsite.Update anti-entrapment plan and email copy of update anti-entrapment plan to the undersigned.