Skip to content
Loading map…

Days Inn & Conference Centre Renfrew - Pool

760 Gibbons Rd, Renfrew ON K7V 4A2 · Outdoor Class B Pool

Inspection summary

Days Inn & Conference Centre Renfrew - Pool has been inspected 7 times by Renfrew County and District Health Unit since June 10, 2025. The most recent inspection, on September 1, 2026, found no infractions.

3 of 7 inspections on record found no infractions at all. In the past 12 months there were 6 inspections with 6 infractions recorded. All recorded findings relate to upkeep, equipment or paperwork rather than water quality or direct safety risks.

The last 2 inspections in a row found no infractions. Recent inspections have recorded fewer infractions than earlier ones, so the record is improving.

What these findings mean

Health authorities word their findings differently, so we group them by what they mean for the people using the facility. Higher-risk findings are the ones that could directly cause illness or injury, such as water that is not properly treated.

  • Permits, records and postingLower risk

    Operating permits, water-test logs, posted bather rules and emergency procedures. Daily test logs are how operators show the water was checked and treated between inspections.

    Recorded 6 times across 4 separate inspections, most recently on July 27, 2026. For example: Other records completed and signed

About this data

These results come from Renfrew County and District Health Unit, which inspects food premises and other public facilities in this area. We republish the authority's public disclosure data and refresh it regularly; the official record is the final word.

7 inspections

  1. Follow-up

    0 infractions

  2. Required

    0 infractions

  3. Follow-up

    1 infraction

    • Other records completed and signed
      • Ensure cyanurate stabilization is determined (at least 1/week).
  4. Follow-up

    1 infraction

    • Daily records completed and signed
      • Pool: Check and record total alkalinity, pH, FAC and total chlorine or total bromine and water clarity 30 minutes prior to opening.
  5. Follow-up

    2 infractions

    • Daily records completed and signed
      • Record estimated number of bathers admitted to pool or spa during the operating day.
      • Record reading of the make-up water meter.
      • Record any emergencies, rescues, or breakdown of equipment that have occurred.
      • Record time of day for testing of emergency telephone.
      • Record time of day for emergency stop button test.
      • Record time of day for testing of ground fault detector.
      • Pool: Check and record total alkalinity, pH, FAC and total chlorine or total bromine and water clarity 30 minutes prior to opening.
      • Ensure parameters specified in Section 7 (11) are checked and recorded at least every 2 hours where the pool or spa does not have an automated sensing device.
      • Ensure test-button associated with ground leakage detecting and de-energizing devices are activated.
      • Ensure any type and amount of chemicals added manually to the pool or spa is recorded.
    • Other records completed and signed
      • Ensure cyanurate stabilization is determined (at least 1/week).
      • Ensure all of the water, gravity and suction outlet covers are inspected once within every 30 operating days.
      • Ensure test button associated with ground leakage detecting and de-energizing devices are test monthly or according to manufacturer instruction.
  6. Required

    2 infractions

    • Daily records completed and signed
      • Record estimated number of bathers admitted to pool or spa during the operating day.
      • Record reading of the make-up water meter.
      • Record any emergencies, rescues, or breakdown of equipment that have occurred.
      • Record time of day for testing of emergency telephone.
      • Record time of day for testing of ground fault detector.
      • Ensure parameters specified in Section 7 (11) are checked and recorded at least every 2 hours where the pool or spa does not have an automated sensing device.
    • Other records completed and signed
      • Ensure cyanurate stabilization is determined (at least 1/week).
      • Ensure all of the water, gravity and suction outlet covers are inspected once within every 30 operating days.
      • Ensure test button associated with ground leakage detecting and de-energizing devices are test monthly or according to manufacturer instruction.
  7. Required

    0 infractions

Nearby inspected facilities

Own this business? Add a badge to your website