- Risk Management Inspection
0 infractions
- Demand Inspection
2 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- the sample 26EN-092E00538 submitted on April 2, 2026, was unsatisfactory: Total coliforms present, Pseudomonas aeruginosa isolated and HPC 2520.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- the sample 26EN-092E00538 submitted on April 2, 2026, was unsatisfactory: Total coliforms present, Pseudomonas aeruginosa isolated and HPC 2520.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
0 infractions
- Risk Management Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- The combined chlorine residual was 2.16 ppm. Please ensure that the combined chlorine residual is maintained at the lowest level possible, and below 1 ppm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- The combined chlorine residual was 2.16 ppm. Please ensure that the combined chlorine residual is maintained at the lowest level possible, and below 1 ppm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
4 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- the sample 25EN-310E00599 submitted on November 6, 2025, was unsatisfactory: Total coliforms were present.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total alkalinity was 37 ppm. Please ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Rate of filtration was 15.87 gpm/sq ft based on a filtration area of 12.6 sq ft and the flow rate 200 gpm. The flow rate should not exceed 155 gpm for the proper filtration rate (under 12.5 gpm/ft2).
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- The whirlpool water temperature was 41C. Please ensure that the whirlpool water temperature is maintained below 40C.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
3 infractions
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total alkalinity was 37 ppm. Please ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Rate of filtration was 15.87 gpm/sq ft based on a filtration area of 12.6 sq ft and the flow rate 200 gpm. The flow rate should not exceed 155 gpm for the proper filtration rate (under 12.5 gpm/ft2).
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- The whirlpool water temperature was 41C. Please ensure that the whirlpool water temperature is maintained below 40C.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
4 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- the sample 25EN-024E00045 submitted on January 24, 2025, was unsatisfactory: HPC 140.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total alkalinity was 37 ppm. Please ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Rate of filtration was 15.87 gpm/sq ft based on a filtration area of 12.6 sq ft and the flow rate 200 gpm. The flow rate should not exceed 155 gpm for the proper filtration rate (under 12.5 gpm/ft2).
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- The whirlpool water temperature was 41C. Please ensure that the whirlpool water temperature is maintained below 40C.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
3 infractions
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total alkalinity was 37 ppm. Please ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Rate of filtration was 15.87 gpm/sq ft based on a filtration area of 12.6 sq ft and the flow rate 200 gpm. The flow rate should not exceed 155 gpm for the proper filtration rate (under 12.5 gpm/ft2).
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- The whirlpool water temperature was 41C. Please ensure that the whirlpool water temperature is maintained below 40C.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
1 infraction
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Cement was added to the bottom of the pool basin to increase the sump depth. Please provide the information for the new volume.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Demand Inspection
3 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- the sample 24EN-180E00161 submitted on June 28, 2024, was unsatisfactory: Total coliform present, Pseudomonas aeruginosa isolated and HPC over 57000.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- the sample 24EN-180E00161 submitted on June 28, 2024, was unsatisfactory: Total coliform present, Pseudomonas aeruginosa isolated and HPC over 57000.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Cement was added to the bottom of the pool basin to increase the sump depth. Please provide the information for the new volume.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Demand Inspection
3 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- the sample WE-24-0001901 submitted on January 4, 2024, was unsatisfactory: Total coliform present, Pseudomonas aeruginosa isolated and HPC 120.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- the sample WE-24-0001901 submitted on January 4, 2024, was unsatisfactory: Total coliform present, Pseudomonas aeruginosa isolated and HPC 120.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Cement was added to the bottom of the pool basin to increase the sump depth. Please provide the information for the new volume.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
1 infraction
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Cement was added to the bottom of the pool basin to increase the sump depth. Please provide the information for the new volume.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Demand Inspection
2 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- the sample WE-23-0131350 submitted on December 7, 2023, was unsatisfactory: Total coliforms present.Updated on December 11: Pseudomonas aeruginosa was isolated as well.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Cement was added to the bottom of the pool basin to increase the sump depth. Please provide the information for the new volume.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
1 infraction
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Cement was added to the bottom of the pool basin to increase the sump depth. Please provide the information for the new volume.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Monitoring Inspection
2 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- the sample WE-23-0113349 submitted on October 19, 2023, was unsatisfactory: Pseudomonas aeruginosa isolated.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Cement was added to the bottom of the pool basin to increase the sump depth. Please provide the information for the new volume.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Demand Inspection
3 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- the sample WE-23-0113349 submitted on October 19, 2023, was unsatisfactory: Pseudomonas aeruginosa isolated.
- 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
- Cement was added to the bottom of the pool basin to increase the sump depth. The changes in pool volume and anti-entrapment compliance have not been reflected in the anti-entrapment compliance plan and the compliance has not been confirmed.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Cement was added to the bottom of the pool basin to increase the sump depth. The changes in pool volume and anti-entrapment compliance have not been reflected in the anti-entrapment compliance plan and the compliance has not been confirmed.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
2 infractions
- 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
- Cement was added to the bottom of the pool basin to increase the sump depth. The changes in pool volume and anti-entrapment compliance have not been reflected in the anti-entrapment compliance plan and the compliance has not been confirmed.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Cement was added to the bottom of the pool basin to increase the sump depth. The changes in pool volume and anti-entrapment compliance have not been reflected in the anti-entrapment compliance plan and the compliance has not been confirmed.
- 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?