Skip to content
Loading map…

Hampton Inn & Suites - Pool

10405 117 Avenue Grande Prairie AB T8V 6M8 · Aquatic Facility

15 inspections

  1. Monitoring Inspection

    0 infractions

  2. Risk Management Inspection

    0 infractions

  3. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Unsatisfactory laboratory result received, collection date November 12, 2025. HPC: 470 CFU/mLHPC must be less than 100 CFU/mL
  4. Risk Management Inspection

    0 infractions

  5. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Unsatisfactory laboratory result received, collection date August 6, 2025 - HPC 2,490 CFU/mLEnsure pool water is super-chlorinated, balance the pool water chemistry and then resample this week.
  6. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Unsatisfactory laboratory result received, collection date July 30, 2025 - HPC 390 ml/CFU.Resample the pool.
  7. Risk Management Inspection

    0 infractions

  8. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample collected on July 9, 2025HPCL 820 cfu/ml** Ensure pool water is shock chlorinated, returned back to chemical operating parameters and a sample is resubmitted. ** HPC count must be less than 100 cfu/ml
  9. Risk Management Inspection

    0 infractions

  10. Risk Management Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample collected on June 4, 2025.HPC: 150 cfu/mLHPC count must be less than 100 cfu/mL
  11. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample collected on May 28, 2025HPC: 1780 cfu/mLEnsure pool is shock chlorinated and then balance the water chemistry before submitting a water sample. HPC count must be less than 100 cfu/mL
  12. Risk Management Inspection

    0 infractions

  13. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample collected on May 14, 2025HPC: 120 cfu/mLEnsure HPC is below 100 cfu/mL.
  14. Risk Management Inspection

    0 infractions

  15. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC: 1640 CFU/mLHPC must be less than 100 CFU/mLEnsure pool water is shocked, and pool water chemistry rebalanced before submitting a resample on Monday.