Skip to content
Loading map…

Nexsource Centre - Hot Tub

4823 49 Avenue Sylvan Lake AB T4S 1M6 · Aquatic Facility

16 inspections

  1. Monitoring Inspection

    2 infractions

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • FAC was at .72 and ORP was fluctuating in the 600 range in a review of the records. Chemistry was adjusted and chlorine reached 4.72 ppm.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Total alkalinity was found to be 43 ppm when tested. Adjustments were made and the alkalinity was increased to 86 ppm.
  2. Monitoring Inspection

    0 infractions

  3. Risk Management Inspection

    0 infractions

  4. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Results from sample collected Oct. 1 showed the presence of total coliforms.
  5. Monitoring Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • TA was at 52 ppm. Staff added water to pool and TA climbed to 63 ppm.
  6. Risk Management Inspection

    0 infractions

  7. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC of 380 in sample collected Nov. 19.
  8. Monitoring Inspection

    0 infractions

  9. Monitoring Inspection

    2 infractions

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • FAC was below 2 ppm and ORP was not consistently above 700 according to records. FAC was increased during inspection.pH 6.9
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine levels were averaging double the FAC. Operator will adjust.
  10. Monitoring Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • pH was high at 8.54 during inspection staff adjusted the pH and final result was 7.52
  11. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC was 170 CFU/mL in sample collected Mar. 12.
  12. Risk Management Inspection

    0 infractions

  13. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Sample collected Nov. 28 had an HPC level of 120CFU/mL
  14. Monitoring Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • - Free available chlorine: 1.51-1.56 ppm (corrected by operator and retest yielded result of 2.9 ppm)- pH: 7.1
  15. Risk Management Inspection

    0 infractions

  16. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC exceedance: 130