Northern Lights Aquatic Centre - Main Pool
1201 Main Street SE Slave Lake AB T0G 2A3 · Aquatic Facility
12 inspections
- Monitoring Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total alkalinity is measured at a concentration of 33 ppm at the time of inspection. Operator was able make adjustments to the pool chemistry by adding sodium bicarbonate to raise the alkalinity during the inspection. Alkalinity was measured at 71 ppm after adjustments. Ensure that the alkalinity of the pool is maintained at a concentration of no less than 60 ppm and no greater than 180 ppm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
0 infractions
- Risk Management Inspection
0 infractions
- Monitoring Inspection
0 infractions
- Risk Management Inspection
0 infractions
- Risk Management Inspection
1 infraction
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- The flow rate displayed on the flowmeter has decreased in comparison to the previous inspection. Readings and Turnover rates are the following:Pool volume: 630.5 cubic meters = 166560 gallonsFlow rate: 330 gallons per minuteTurnover rate: 8.412 hours (Unsatisfactory)Operator stated that a new flowmeter is available on site for replacement and backwash will be completed within a week from inspection. Please ensure that there is adequate flow to allow complete recirculation of the pool water within 6 hours.
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- Monitoring Inspection
1 infraction
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- Unsatisfactory turnover was noted with insufficient flow rate. Ensure that there is adequate flow to allow complete recirculation of the pool water within 6 hours.
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- Risk Management Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- The total alkalinity reading was noted to be below the minimum acceptable level of 60 ppm. Operator corrected the violation during inspection.Pool chemistry reading after correction:Free Chlorine: 1.53 ppmpH: 6.9Total Alkalinity: 82 ppmCombined Chlorine: 0.32 ppm
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Unsatisfactory turnover was noted with insufficient flow rate. Ensure that there is adequate flow to allow complete recirculation of the pool water within 6 hours.Pool volume: 630.5 cubic meters (approximately 166560 gallons)Flow rate: 435 gallons per minuteTurnover rate: 6.38 hoursUpdate: Turnover rate remains unsatisfactory.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Unsatisfactory turnover was noted with insufficient flow rate. Ensure that there is adequate flow to allow complete recirculation of the pool water within 6 hours.Pool volume: 630.5 cubic meters (approximately 166560 gallons)Flow rate: 430 gallons per minuteTurnover rate: 6.45 hoursUpdate: Turnover rate remains unsatisfactory with the flow rate unchanged.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Unsatisfactory turnover was noted with insufficient flow rate. Ensure that there is adequate flow to allow complete recirculation of the pool water within 6 hours.Pool volume: 630.5 cubic meters (approximately 166560 gallons)Flow rate: 430 gallons per minuteTurnover rate: 6.45 hoursUpdate: Turnover rate remains unsatisfactory with the flow rate unchanged.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Monitoring Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Unsatisfactory turnover was noted with insufficient flow rate. Ensure that there is adequate flow to allow complete recirculation of the pool water within 6 hours.Pool volume: 630.5 cubic meters (approximately 166560 gallons)Flow rate: 430 gallons per minuteTurnover rate: 6.45 hours
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?