Skip to content
Loading map…

Oxford Towers S. Pool

50 Exeter Rd, Ajax ON L1S 2K1 · Pool - Class B

Inspection summary

Oxford Towers S. Pool has been inspected 3 times by Durham Region Health Department since June 27, 2025. The most recent inspection, on June 29, 2026, found no infractions.

2 of 3 inspections on record found no infractions at all. In the past 12 months there was 1 inspection with 0 infractions recorded. The higher-risk findings here relate to: Pool and spa water quality.

The last 2 inspections in a row found no infractions.

What these findings mean

Health authorities word their findings differently, so we group them by what they mean for the people using the facility. Higher-risk findings are the ones that could directly cause illness or injury, such as water that is not properly treated.

  • Pool and spa water qualityHigher risk

    For pools, spas and splash pads, inspectors test disinfectant levels, pH and water clarity, and check safety equipment. Water that is not properly treated can spread skin, ear and stomach infections.

    Recorded 2 times on June 27, 2025. For example: Written notification is received from the operator at least 14 days prior to opening or reopening public pool after construction, alteration or closure (more than 4 weeks)

  • Equipment and utensilsLower risk

    Pumps, filters, chemical feeders and safety equipment such as lifebuoys, reaching poles and first-aid kits must be present and working. Missing safety equipment can matter a great deal in an emergency.

    Recorded once on June 27, 2025. For example: Safety equipment available and in good repair

About this data

These results come from Durham Region Health Department, which inspects food premises and other public facilities in this area. We republish the authority's public disclosure data and refresh it regularly; the official record is the final word.

3 inspections

  1. Routine

    0 infractions

  2. Re-Inspection

    0 infractions

  3. Routine

    3 infractions

    • Written notification is received from the operator at least 14 days prior to opening or reopening public pool after construction, alteration or closure (more than 4 weeks)
      • Fail to provide written notification at least 14 days prior to opening or reopening the public pool
      • Operator to provide written notification at least 14 days prior to opening or reopening the public pool after construction, alteration or closure (more than 4 weeks)
    • Pool, deck and walls maintained in a sanitary condition, safe and free from hazards
      • Fail to ensure deck surfaces free from hazards
      • Operator to maintain deck surfaces free from hazards
    • Safety equipment available and in good repair
      • CLOSE POOL
      • Fail to provide a fully supplied first-aid kit
      • Fail to provide safety equipment in good repair
      • Fail to provide two buoyant throwing aids with rope (6 mm in diameter, 1/2 width of pool plus 3 m)
      • Operator to provide a first-aid kit with contents as prescribed by the Regulation
      • Operator to provide two buoyant throwing aids with rope (6 mm in diameter, 1/2 width of pool plus 3 m)
      • Operator to ensure all safety equipment is in good repair

Nearby inspected facilities

Own this business? Add a badge to your website