Skip to content
Loading map…

Pincher Creek Aquatic Centre - Slide

895 Main Street Pincher Creek AB T0K 1W0 · Aquatic Facility

8 inspections

  1. Monitoring Inspection

    0 infractions

  2. Monitoring Inspection

    0 infractions

  3. Monitoring Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Alkalinity was 11 ppm.
  4. Demand Inspection

    0 infractions

  5. Monitoring Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Alkalinity measured 30 ppm. Staff noted prior to opening that alkalinity was 60 ppm. Please increase alkalinity to minimum 60 ppm.
  6. Monitoring Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Alkalinity measured 4 ppm. Please increase to 60 ppm.
  7. Demand Inspection

    0 infractions

  8. Risk Management Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Circ pump ran at 90 GPM. Corresponding filtration rate 29 GPM/ft2 (90 GPM /3.14 ft2).Operator will reduce flow rate.