Rankins Landing GCC 19, 20, 22
58 Alice St W, Thornbury ON N0H 2P0 · Outdoor B
Inspection summary
Rankins Landing GCC 19, 20, 22 has been inspected 6 times by Grey Bruce Health Unit (Grey Bruce Public Health) since August 22, 2023. The most recent inspection, on May 14, 2026, recorded 1 infraction.
4 of 6 inspections on record found no infractions at all. In the past 12 months there was 1 inspection with 1 infraction recorded. The higher-risk findings here relate to: Pool and spa water quality.
The number of infractions per inspection has stayed roughly the same over time.
What these findings mean
Health authorities word their findings differently, so we group them by what they mean for the people using the facility. Higher-risk findings are the ones that could directly cause illness or injury, such as water that is not properly treated.
Pool and spa water qualityHigher risk
For pools, spas and splash pads, inspectors test disinfectant levels, pH and water clarity, and check safety equipment. Water that is not properly treated can spread skin, ear and stomach infections.
Recorded 2 times across 2 separate inspections, most recently on May 14, 2026. For example:
The owner/operator notified the public health unit, in writing, at least 14 days before the public pool was put into use after construction/alteration or before opening/reopening after any closure that lasts more than 4 weeks.
About this data
These results come from Grey Bruce Health Unit (Grey Bruce Public Health), which inspects food premises and other public facilities in this area. We republish the authority's public disclosure data and refresh it regularly; the official record is the final word.
6 inspections
- Routine
1 infraction
- The owner/operator notified the public health unit, in writing, at least 14 days before the public pool was put into use after construction/alteration or before opening/reopening after any closure that lasts more than 4 weeks.
- Fail to notify public health at least 14 days prior to reopening a pool that had been closed for more than 4 weeks.
- The owner/operator notified the public health unit, in writing, at least 14 days before the public pool was put into use after construction/alteration or before opening/reopening after any closure that lasts more than 4 weeks.
- Routine
0 infractions
- Routine
0 infractions
- Routine
0 infractions
- Routine
1 infraction
- No food or beverage except water in pool or on deck
- Routine
0 infractions
Nearby inspected facilities
- Rankins Landing GCC 26
100 Alice W, Thornbury ON N0H2P0
4 inspections
- Beaver Valley Community Centre - Food
58 Alfred St W, Thornbury ON N0H 2P0
1 inspection
- ReVive Skincare and Esthetics
3 53 Arthur St W, Thornbury ON N0H 2P0
4 inspections
- Root to Fruit
15 Alice St West, Thornbury ON N0H 2P0
3 inspections
- Ultramar/ Circle K
72 Arthur St W, Thornbury ON
2 inspections
- Tim Hortons
48 Arthur Street W, Thornbury ON N0H 2P0
5 inspections
- Venti Venti
16 Louisa Street, Thornbury ON N0H 1J0
3 inspections
- First Baptist Church
72 Bruce Street South, Thornbury ON N0H 2P0
1 inspection