  1. Risk Management Inspection

    2 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The automated chemical feeding and monitoring system's readings for chlorine did not match the manual test readings.Automated system reading 4.81 ppm.Pool operator's reading was over 9ppm.Inspector's reading was 10.20 ppmService the automated system. May need further calibration.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • On-site pool records suggest that the combined chlorine is not being tested on the weekends.Combined chlorine must be tested and recorded daily.
  2. Risk Management Inspection

    0 infractions

  3. Risk Management Inspection

    9 infractions

    • 01. Is the pool in compliance with verbal and/or written approvals and/or orders issued by an Executive Officer, and is the Executive Officer not being obstructed or interfered with in the exercise of his/her powers?
      • Operator would not show inspectors the daily / weekly records of water chemistry testing being done which were said to be stored on a phone.Records must be available for inspector's review at all times.
    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • Free available chlorine measured 0.4ppm when physically tested.Automated system showed chlorine measuring 0.0ppm.This is too low. Make adjustments and ensure the chlorine is maintained at a minimum of 1.0 ppm.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • December 1, 2025 - Total alkalinity measured 40ppm.November 19, 2025 - Total alkalinity measured 42ppm and 43ppm (tested twice). This is a repeat violation that has been noted on previous inspection reports.Make adjustments and ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Automated system's readings for chlorine and flow were 0.0ppm and 0.0l/h respectively.This did not match with the flow meter's reading which was around 118l/h.This did not match with the physical chlorine test that detected 0.4ppm.Automated system requires servicing.
    • 09. Are general nuisance conditions, other than those noted in other violations, being prevented at this pool (Critical)?
      • The reagents inside of the two Taylor Test Kits on site were submerged in liquid and are very likely no longer sufficient / accurate.One container of pH indicator solution expired in January of 2017.Update test kits and reagents and maintain them in a clean and sanitary condition.
    • 11. Does the facility have a valid permit and does the facility operate in compliance with the conditions of that permit?
      • No permit posted on site.A valid / current pool permit is required and must be posted in a location that is easily seen by patrons.
    • 15. Has an owner or owner's agent, if any, been identified and is the pool operated and maintained by a qualified pool operator?
      • No evidence on site that anyone responsible for the swimming pool is certified.A qualified pool operator is required to maintain / operate a pool.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • Chemical parameters in the pool are not being tested or recorded to ensure water quality.Binder in mechanical room contained daily test results from 2017 and nothing after.Chlorine and pH must be tested (and recorded) daily.Alkalinity must be tested (and recorded) weekly at minimum. Daily visual checks / inspections of drain covers are not being done or recorded. Again, this is required.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • No current anti-entrapment plan on site.Anti-entrapment plans were required by the end of November of 2019.Anti-entrapment plans must be updated when changes are made such as the replacement of submerged suction cover outlets.
  4. Monitoring Inspection

    6 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • November 19, 2025 - Total alkalinity measured 42ppm and 43ppm (tested twice). This is a repeat violation that has been noted on previous inspection reports.Make adjustments and ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 09. Are general nuisance conditions, other than those noted in other violations, being prevented at this pool (Critical)?
      • The reagents inside of the two Taylor Test Kits on site were submerged in liquid and are very likely no longer sufficient / accurate.One container of pH indicator solution expired in January of 2017.Update test kits and reagents and maintain them in a clean and sanitary condition.
    • 11. Does the facility have a valid permit and does the facility operate in compliance with the conditions of that permit?
      • No permit posted on site.A valid / current pool permit is required and must be posted in a location that is easily seen by patrons.
    • 15. Has an owner or owner's agent, if any, been identified and is the pool operated and maintained by a qualified pool operator?
      • No evidence on site that anyone responsible for this swimming pool is certified.No certified operator on site today.A qualified pool operator is required to maintain / operate a pool.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • Chemical parameters in the pool are not being tested or recorded to ensure water quality.Binder in mechanical room contained daily test results from 2017 and nothing after.Chlorine and pH must be tested (and recorded) daily.Alkalinity must be tested (and recorded) weekly at minimum. Daily visual checks / inspections of drain covers are not being done or recorded. Again, this is required.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • No current anti-entrapment plan on site.Anti-entrapment plans were required by the end of November of 2019.Anti-entrapment plans must be updated when changes are made such as the replacement of submerged suction cover outlets. This outstanding violation must be addressed to avoid a closure order being issued.
  5. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample submitted on October 21, 2025 had an HPC of 1870.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Repeat violation: 2023-12-07: The alkalinity of the pool was measured as 56ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm. The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incomplete.Please ensure an antientrapment plan is filled out and fully completed.
  6. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample submitted on September 30, 2025 was not processed due to holiday.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Repeat violation: 2023-12-07: The alkalinity of the pool was measured as 56ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm. The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incomplete.Please ensure an antientrapment plan is filled out and fully completed.
  7. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Sample collected and analyzed on 2024- 10- 22 had an HPC count of 1530 cfu/ml.Treat and resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Repeat violation: 2023-12-07: The alkalinity of the pool was measured as 56ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm. The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incomplete.Please ensure an antientrapment plan is filled out and fully completed.
  8. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Sample collected on 2024- 03- 25 had an HPC count of 810 cfu/ml.Sample collected and analyzed on 2024- 03- 19 had an HPC count of 560 cfu/ml.Treat and resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Repeat violation: 2023-12-07: The alkalinity of the pool was measured as 56ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm. The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incomplete.Please ensure an antientrapment plan is filled out and fully completed.
  9. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Sample collected and analyzed on 2024- 03- 19 had an HPC count of 560 cfu/ml.Treat and resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Repeat violation: 2023-12-07: The alkalinity of the pool was measured as 56ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm. The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incomplete.Please ensure an antientrapment plan is filled out and fully completed.
  10. Risk Management Inspection

    2 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Repeat violation: 2023-12-07: The alkalinity of the pool was measured as 56ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm. The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incomplete.Please ensure an antientrapment plan is filled out and fully completed.
  11. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • REPEAT VIOLATION:Sample collected and analyzed on 2023- 12- 19 had an HPC count of 4840 cfu/ml.The sample collected on December 12, 2023 had an HPC count of 470 CFU/ml present.Treat and resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Repeat violation: 2023-12-07: The alkalinity of the pool was measured as 56ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm. The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incomplete.Please ensure an antientrapment plan is filled out and fully completed.
  12. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The sample collected on December 12, 2023 had an HPC count of 470 CFU/ml present.Treat and resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Repeat violation: 2023-12-07: The alkalinity of the pool was measured as 56ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm. The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incomplete.Please ensure an antientrapment plan is filled out and fully completed.
  13. Demand Inspection

    2 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Repeat violation: 2023-12-07: The alkalinity of the pool was measured as 56ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm. The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incomplete.Please ensure an antientrapment plan is filled out and fully completed.
  14. Risk Management Inspection

    2 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incompleted.Please ensure an antientrapment plan is filled out and fully completed.
  15. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • REPEAT VIOLATION:Sample collected and analyzed on 2023-11-28 shows the presence of HPC 440 cfu/ml.Sample collected and analyzed on 2023-11-21 shows the presence of HPC 850 cfu/ml. Please treat the pool and submit in a resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incompleted.Please ensure an antientrapment plan is filled out and fully completed.
  16. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Sample collected and analyzed on 2023-11-21 shows the presence of HPC 850 cfu/ml. Please treat the pool and submit in a resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incompleted.Please ensure an antientrapment plan is filled out and fully completed.
  17. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The sample collected on Nov 07 2023, had an HPC count of 300 cfu/ml.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incompleted.Please ensure an antientrapment plan is filled out and fully completed.
  18. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The sample collected on Sep 12, 2023, had an HPC count of >57,000CFU/ml.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • The alkalinity of the pool was measured as 50 ppm. Please ensure the alkalinity of the pool water is maintained between 60-180 ppm.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The antientrapment plan is incompleted.Please ensure an antientrapment plan is filled out and fully completed.