Skip to content
Loading map…

Tall Timber Leisure Park - Pool

606 Main Avenue E Sundre AB T0M 1X0 · Aquatic Facility

14 inspections

  1. Monitoring Inspection

    0 infractions

  2. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water result: HPC: 360 CFU/mlResample *Pool last day of opening is September 7, 2025.
  3. Risk Management Inspection

    0 infractions

  4. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • 1. Routine water sample result: TC PresentVerify free chlorine and pH levels are withing the required range.Please resample to confirm test result. Make sure to mark the bottle as "Resample".
  5. Risk Management Inspection

    0 infractions

  6. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • 1. Routine water sample result: TC PresentPlease resample to confirm test result. Make sure to mark the bottle as "Resample".
  7. Monitoring Inspection

    0 infractions

  8. Risk Management Inspection

    0 infractions

  9. Risk Management Inspection

    1 infraction

    • 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
      • Pool Volume 39097 GalCirculation Rate 105 GPMTurnover time = 6.2 hrMinimum flow rate required to meet 6 hour turnover is: 109 GPM
  10. Risk Management Inspection

    1 infraction

    • 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
      • Pool Volume 148,000 L = 39097 GalCirculation Rate 300 L/Min = 79.25 GPMTurnover Rate = 8.2hr (must be 6 hours)(Pool constructed in 1980's)Filter: 2x Pentair Tagelus TA100Max Filtration Rate: 100 GPMMinimum flow rate required to meet 6 hour turnover is: 109 GPM (413 L/min)
  11. Monitoring Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • 1. Pool filled after winter hiatus. Pool does not open until the coming weekend. BacT sample submitted 2 days prior to inspection. Results should be known on Friday prior to opening..
    • 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
      • Pool Volume 148,000 L = 39097 GalCirculation Rate 300 L/Min = 79.25 GPMTurnover Rate = 8.2hr (must be 6 hours)(Pool constructed in 1980's)Filter: 2x Pentair Tagelus TA100Max Filtration Rate: 100 GPMMinimum flow rate required to meet 6 hour turnover is: 109 GPM (413 L/min)
  12. Risk Management Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • 1. Pool filled after winter hiatus. Pool does not open until the coming weekend. Inspector will visit and review results with the operator.
  13. Demand Inspection

    0 infractions

  14. Demand Inspection

    0 infractions