Skip to content
Loading map…

The Moose Hotel & Suites - Whirlpool 2

345 Banff Avenue Banff AB T1L 1H8 · Aquatic Facility

4 inspections

  1. Monitoring Inspection

    0 infractions

  2. Monitoring Inspection

    3 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Total alkalinity was low; 30 ppm.- Please raise the alkalinity so that it is within the 60-180 ppm range.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Floating weir on the skimmer across from the stairs was missing. - Please replace the floating weir.
    • 13. Are the general safety devices and physical conditions in this pool providing a safe environment (Non-Critical)?
      • *Tiles are scheduled to be replaced in the upcoming weeks* Previously cited: " The deck around the outdoor whirlpools has tiles that are lifting and cracked. Some of the tiles have sharp edges and could cause physical injury. - Please repair/replace any damaged or lifting tiles."
  3. Risk Management Inspection

    1 infraction

    • 13. Are the general safety devices and physical conditions in this pool providing a safe environment (Non-Critical)?
      • Deck around outdoor whirlpools have tiles that are lifting and do not stay in place. Some of the tiles have sharp edges and could cause physical injury. - Please provide written confirmation that deck will be repaired with proposed timeline for approval by our office.
  4. Monitoring Inspection

    2 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Alkalinity levels were low 42 ppm. - Please raise alkalinity levels to be within the 60-180 ppm range.
    • 13. Are the general safety devices and physical conditions in this pool providing a safe environment (Non-Critical)?
      • Deck around outdoor whirlpools have tiles that are lifting and do not stay in place. Some of the tiles have sharp edges and could cause physical injury. - Please provide written confirmation that deck will be repaired with proposed timeline for approval by our office.