Skip to content
Loading map…

Town of Bonnyville Pool - Main Pool

4712 48 Street Bonnyville AB T9N 2J7 · Aquatic Facility

8 inspections

  1. Monitoring Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine levels were recorded at 1.43 ppm. Ensure that combined chlorine levels are maintained as low as possible.
  2. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC- 57,000 CFU/mL.Results have been discussed with pool supervisor. Instructed to treat the pool and submit a resample.
  3. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC- 810cfu/mLResults have been discussed with pool supervisor. Instructed to treat the pool and submit a resample. Procedure:1. Increase Free Available Chlorine (FAC) level to 10 ppm and maintain pH at or near 7.2.2. Run the water through the circulation system for at least 4-6 hours. 3. Adjust water chemistry to regular operating parameters.4. Take a bacteriological water sample and send it to the lab.
  4. Monitoring Inspection

    0 infractions

  5. Monitoring Inspection

    1 infraction

    • 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
      • -One of the pool handrails (on the left side from the main entrance) was moving, it was not sturdy.Action required:-Please fix the indicated handrail.
  6. Risk Management Inspection

    0 infractions

  7. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC = 230 CFU/mLTC ABSENT
  8. Monitoring Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Pool volume = 165714Gflow rate = 425gpmturnover = 165714/425/60=6.5hPlease adjust flow rate to enable a turnover within 6h.