Skip to content
Loading map…

True Blue Swim Riverbend - Small Pool

5637 Riverbend Road NW Edmonton AB T6H 5K4 · Aquatic Facility

13 inspections

  1. Risk Management Inspection

    0 infractions

  2. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • the sample 26EN-016E00062 submitted on January 16, 2026, was unsatisfactory: HPC 2540.
  3. Risk Management Inspection

    0 infractions

  4. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • the sample 25EN-283E00168 submitted on October 10, 2025, was unsatisfactory: Pseudomonas aeruginosa was isolated.
  5. Demand Inspection

    2 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • the sample 25EN-283E00168 submitted on October 10, 2025, was unsatisfactory: Pseudomonas aeruginosa was isolated.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine was 1.78 ppm. Please ensure that the combined chlorine is maintained at the lowest level possible and below 1 ppm. Updated on March 4, 2025:1. Combined chlorine was 2.17 ppm. Please ensure that the combined chlorine is maintained at the lowest level possible and below 1 ppm.
  6. Risk Management Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine was 1.78 ppm. Please ensure that the combined chlorine is maintained at the lowest level possible and below 1 ppm. Updated on March 4, 2025:1. Combined chlorine was 2.17 ppm. Please ensure that the combined chlorine is maintained at the lowest level possible and below 1 ppm.
  7. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The sample 25EN-143E00168 submitted on May 23, 2025, was unsatisfactory: HPC 590.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine was 1.78 ppm. Please ensure that the combined chlorine is maintained at the lowest level possible and below 1 ppm. Updated on March 4, 2025:1. Combined chlorine was 2.17 ppm. Please ensure that the combined chlorine is maintained at the lowest level possible and below 1 ppm.
  8. Risk Management Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine was 1.78 ppm. Please ensure that the combined chlorine is maintained at the lowest level possible and below 1 ppm. Updated on March 4, 2025:1. Combined chlorine was 2.17 ppm. Please ensure that the combined chlorine is maintained at the lowest level possible and below 1 ppm.
  9. Demand Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine was 1.78 ppm. Please ensure that the combined chlorine is maintained at the lowest level possible and below 1 ppm.
  10. Risk Management Inspection

    0 infractions

  11. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • the sample WE-24-0035151 submitted on April 12, 2024, was unsatisfactory: HPC 390
  12. Risk Management Inspection

    0 infractions

  13. Monitoring Inspection

    2 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine was 1.51 ppm. Should be as low as possible, and below 1 ppm.Updated on October 17, 2022: combined chlorine was 1.15 ppm.Updated on December 7, 2023: combined chlorine was 1.63 ppm.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Filtration rate was 18.37 gpm/ft 2 (with flow rate 180 gpm and filters area 9.8 ft2). It was addressed during the inspection: flow rate was lowered to about 150 gpm, which resulted in filtration rate 15.3 gpm/ft2 and turnover period 1.22 hours.