Skip to content
Loading map…

10711 47 Avenue NW - Swimming Pool

10711 47 Avenue NW Edmonton AB T6H 5J1 · Aquatic Facility

8 inspections

  1. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • the microbiological water sample 26EN-177E00193 submitted on June 26, 2026, was unsatisfactory: Total coliforms were present.
  2. Monitoring Inspection

    2 infractions

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The main drain covers were replaced. No notification to EPH-AHS has been made, and no updated Anti-Entrapment Compliance Plan was submitted for review. The violation was addressed during the inspection. New drain covers according to the plan were Aquastar 32PD101, installed on April 22, 2025, which will expire on April 22, 2030.
    • 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
      • 1. The main drain covers were replaced. No notification to EPH-AHS has been made, and no updated Anti-Entrapment Compliance Plan was submitted for review. The violation was addressed during the inspection. New drain covers according to the plan were Aquastar 32PD101, installed on April 22, 2025, which will expire on April 22, 2030.2. The cartridge filter was replaced with a high-rate sand filter, and no notification about the replacement was submitted to EPH-AHS. The information was submitted during the inspection: The high-rate sand filter, Pentair Tagelus TA100, SA 4.9ft2.
  3. Risk Management Inspection

    0 infractions

  4. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • the microbiological water sample 26EN-128E00177 submitted on May 8, 2026, was unsatisfactory: HPC 140.
  5. Risk Management Inspection

    0 infractions

  6. Monitoring Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The turnover period was 6.6 hours based on a volume of 21449 gallons and flow rate about 205 lpm/54 gpm. Note: flow rate was 265 lpm/70 gpm during the previous inspection.
  7. Monitoring Inspection

    0 infractions

  8. Risk Management Inspection

    0 infractions