  1. Monitoring Inspection

    2 infractions

    • 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
      • Some bolts were installed incorrectly or missing on the waterfall feature.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • Monitoring of chemical parameters (Free Chlorine, Total Chorine and pH) must be checked 30 minutes prior to opening, and every 2 hours while the spray park is open.
  2. Demand Inspection

    1 infraction

    • 11. Does the facility have a valid permit and does the facility operate in compliance with the conditions of that permit?
      • A pool permit was not available at the time of the inspection.Ensure a valid pool permit is posted or available for review.
  3. Risk Management Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Latest sample had a heterotrophic plate count noted which indicates disinfection is insufficient. Sampling location changed to tap below chemical monitoring ports where previous sample was taken. Sample submitted today.
    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • Free Chlorine levels were allowed to drop below 2ppm overnight upon the advice of the spray park installer. This likely contributed to the high HPC noted in the last water sample. The Free Chlorine must be maintained at 2ppm or higher at all times. Operator adjusted parameters at the time of inspection.
  4. Monitoring Inspection

    0 infractions

  5. Initial Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • Free Chlorine residual was less than 2ppm. Operator contacted installers and corrected the issue, photo submitted before the end of the day showing residual was over 2ppm.