River Junction has been inspected 2 times by Alberta Health Services (Environmental Public Health) since February 19, 2025. The most recent inspection, on March 3, 2025, recorded 2 infractions.

None of the 2 inspections on record were free of infractions. No inspections are on record from the past 12 months. All recorded findings relate to upkeep, equipment or paperwork rather than direct food-handling risks.

What these findings mean

Health authorities word their violations differently, so we group them by what they mean for food safety. Higher-risk findings are the ones inspectors treat as critical, because they can directly make someone sick.

  • Building, plumbing and upkeepLower risk

    Floors, walls and ceilings must be smooth and clean, with working lighting, ventilation, plumbing, hot and cold water, and washrooms. These are rarely an immediate food-safety risk on their own, but persistent problems can lead to pest or sanitation issues.

    Recorded 3 times across 2 separate inspections, most recently on March 3, 2025. For example: Is the facility properly constructed and maintained in a state of good repair to allow for the safe and sanitary handling of food?

  • Food safety training and certificationLower risk

    Most jurisdictions require a certified food handler or manager on site, and some require allergen or food-worker training. These findings mean the paperwork or the trained person was missing at the time. They do not by themselves mean food was handled unsafely.

    Recorded once on February 19, 2025. For example: Are properly operating hand washing sink(s) accessible to food handlers, located in suitable areas, and stocked with appropriate hand washing supplies?

About this data

These results come from Alberta Health Services (Environmental Public Health), which inspects food premises and other public facilities in this area. We republish the authority's public disclosure data and refresh it regularly; the official record is the final word.

2 inspections

  1. Initial Inspection

    2 infractions

    • 21. Is the facility properly constructed and maintained in a state of good repair to allow for the safe and sanitary handling of food?
      • The lighting fixtures have been replaced with acceptable fixtures. The following items are not required for initial approval to operate however they must be completed within 6 months.The walls are in disrepair. Repair and repaint the walls so they are smooth, nonporous and easily cleanable.The flooring is in disrepair. Repair or replace the flooring in the kitchen. Mar 4 - the walls and ceiling were in the process of being repaired during the inspection. All plastered areas must be finished and painted prior to using the kitchen for food service. Contractor indicated that they were on track to finish on time. The exterior door is taped due to gaps in the door. While this means it is now Pest proof, it is not a permanent fix. Remove the tape and repair the door.Some shelving is made with unsealed wood. Any shelving in the kitchen must be smooth, nonporous and easily cleanable. Either seal the shelving or replace with a more suitable shelf.
    • 23. Is the facility maintained in a clean and sanitary condition?
      • As the facility is currently under construction there was drywall dust etc present. Discussed with the operator that the kitchen must be thoroughly cleaned and sanitized after renovations are complete before any food handling occurs.
  2. Demand Inspection

    2 infractions

    • 13. Are properly operating hand washing sink(s) accessible to food handlers, located in suitable areas, and stocked with appropriate hand washing supplies?
      • A handwash sink must be installed prior to approval to operate will be granted.
    • 21. Is the facility properly constructed and maintained in a state of good repair to allow for the safe and sanitary handling of food?
      • The follow item must be completed prior to approval to operate is granted. The lighting is unprotected fluorescent bulbs. Either install covers for the light fixtures or replace the lights with shatterproof bulbs.The following items are not required for initial approval to operate however they must be completed within 6 months.The walls are in disrepair. Repair and repaint the walls so they are smooth, nonporous and easily cleanable.The flooring is in disrepair. Repair or replace the flooring in the kitchen.The exterior door is taped due to gaps in the door. While this means it is now Pest proof, it is not a permanent fix. Remove the tape and repair the door.Some shelving is made with unsealed wood. Any shelving in the kitchen must be smooth, nonporous and easily cleanable. Either seal the shelving or replace with a more suitable shelf.