Skip to content
Loading map…

Holiday Inn & Suites - Swimming Pool

33 Petrolia Drive County Of Red Deer AB T4E 1B3 · Aquatic Facility

15 inspections

  1. Risk Management Inspection

    1 infraction

    • 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
      • Several missing tiles were observed at the top of the right side skimmer outlet.**Please have the tiles replaced.
  2. Monitoring Inspection

    2 infractions

    • 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
      • Several missing tiles were observed at the top of the right side skimmer outlet.**Please have the tiles replaced.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • The chemical testing kit contained expired bottles dated 04/2025 and 11/2023. Using expired solution can result in inaccurate pool chemistry readings. Please ensure that the chemical testing solution is replaced with non-expired bottles.
  3. Risk Management Inspection

    1 infraction

    • 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
      • Several missing tiles were observed at the top of the right side skimmer outlet.**Please have the tiles replaced.
  4. Monitoring Inspection

    2 infractions

    • 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
      • Several missing tiles were observed at the top of the right side skimmer outlet.**Please have the tiles replaced.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • PHI observed a constant value of 0.4ppm for combined chlorine in the water testing records.**Please ensure proper testing and records are maintained for all water chemistry parameters.
  5. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC= 280 cfu/ml.To shock chlorinate and resample.
  6. Monitoring Inspection

    0 infractions

  7. Risk Management Inspection

    0 infractions

  8. Risk Management Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • The measured pH=8.37**Please have the water chemistry balanced to ensure the pool water is maintained within a pH range of 6.8-7.6.
  9. Risk Management Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • The measured pH=7.84.**Please have the water chemistry balanced to ensure the pool water is maintained within a pH range of 6.8-7.6.-CPO advised that acid has been manually added to the water and the acid sensor replaced
  10. Monitoring Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • The measured pH=8.3.**Please have the water chemistry balanced to ensure the pool water is maintained within a pH range of 6.8-7.6
  11. Risk Management Inspection

    0 infractions

  12. Demand Inspection

    0 infractions

  13. Monitoring Inspection

    0 infractions

  14. Risk Management Inspection

    0 infractions

  15. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC 800 cfu/mL