Skip to content
Loading map…

Inglewood – Kitchen

10 Inglewood Drive Red Deer AB T4R 0L2 · Food - General

12 inspections

  1. Monitoring Inspection

    0 infractions

  2. Monitoring Inspection

    0 infractions

  3. Demand Inspection

    0 infractions

  4. Monitoring Inspection

    0 infractions

  5. Monitoring Inspection

    0 infractions

  6. Risk Management Inspection

    0 infractions

  7. Risk Management Inspection

    1 infraction

    • 22. Are utensils and equipment maintained in a condition and a manner that ensures the safe handling of food?
      • Lindsay stated that the gaskets have arrived, and they will be installed on June 6 in the morning. Target completion date of June 6 2024 .
  8. Risk Management Inspection

    1 infraction

    • 22. Are utensils and equipment maintained in a condition and a manner that ensures the safe handling of food?
      • Torn and damaged gasket on door of insert cooler on cook line to be replaced.New gaskets have been ordered – taped in meantime. Clint maintenance manager has ordered new gaskets although the ones received did not fit so new ones will be ordered Target completion date of June 5 2024 dependent on when gaskets are received.
  9. Risk Management Inspection

    1 infraction

    • 22. Are utensils and equipment maintained in a condition and a manner that ensures the safe handling of food?
      • Torn and damaged gasket on door of insert cooler on cook line to be replaced.New gaskets have been ordered – taped in meantime Target completion date of Apr 30 2024 dependent on when gaskets are received.
  10. Risk Management Inspection

    2 infractions

    • 22. Are utensils and equipment maintained in a condition and a manner that ensures the safe handling of food?
      • Torn and damaged gasket on door of insert cooler on cook line to be replaced.New gaskets have been ordered – taped in meantime Target completion date of Apr 30 2024 dependent on when gaskets are received.
    • 23. Is the facility maintained in a clean and sanitary condition?
      • I spoke with Lindsay over the phone and she let me know that cleaning has been done as requested although she will ask the kitchen staff to do a more thorough job before having me come by for the follow up inspection.
  11. Risk Management Inspection

    2 infractions

    • 22. Are utensils and equipment maintained in a condition and a manner that ensures the safe handling of food?
      • Torn and damaged gasket on door of insert cooler on cook line to be replaced.New gaskets have been ordered – taped in meantime Target completion date of Apr 30 2024 dependent on when gaskets are received.
    • 23. Is the facility maintained in a clean and sanitary condition?
      • Cleaning of baseboards has been started – continued cleaning will take place.In progressPlease Correct by Apr 30Maintenance will be consulted to best repair damaged flooring.
  12. Monitoring Inspection

    3 infractions

    • 04. Does the operator use approved methods for cleaning and sanitizing equipment, utensils, and surfaces?
      • Test strips needed for sink and surface sanitizer.Joe has put an order in for test strips Correct by Apr 17
    • 22. Are utensils and equipment maintained in a condition and a manner that ensures the safe handling of food?
      • Torn and damaged gasket on door of insert cooler on cook line to be replaced.Please replace asap
    • 23. Is the facility maintained in a clean and sanitary condition?
      • Some cleaning requested (baseboard tiles where dirt / grease buildup have accumulated after mopping).Correct by Apr 19Damaged flooring to be addressed – along baseboard near ice machine. Please plan to have this work done – timeline to be discussed.