Sierras Of Inglewood - Whirlpool
45 Inglewood Drive St. Albert AB T8N 0B8 · Aquatic Facility
11 inspections
- Monitoring Inspection
4 infractions
- 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
- The free available chlorine was less than 2.0 ppm in a basin above 30 degrees C.
- 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
- pH was 6.66, please increase to a minimum of 6.8.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Alkalinity was 57 ppm, please increase to a minimum of 60 ppm.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- June 30, 2026: Turnover rate is not meeting the required 20 minutes. Increase flow rate to 124 gpm to meet requirement. January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
2 infractions
- 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
- The free available chlorine was less than 2.0 ppm in a basin above 30 degrees C.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- June 30, 2026: Turnover rate is not meeting the required 20 minutes. Increase flow rate to 124 gpm to meet requirement. January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
3 infractions
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Alkalinity was only 35 ppm.
- 06. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Critical)?
- The filter circulation pump was non-operational at time of inspection.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC was 180 cfu/100 ml.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
2 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- TC was isolated.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Demand Inspection
2 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- TC was isolated in the preliminary sample.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Monitoring Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- January 15, 2025: Turnover rate is still just slightly over the required 20 minutes at 20.6 minutes. Please increase the total flow rate slightly. April 4 2024: The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Monitoring Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- A bacteriological sample was not submitted for the whirlpool for the last two weeks. Please take and submit one for testing as soon as possible.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The turnover rate is too slow. Please increase the total flow rate to ensure a 20 minute or less turnover.(Pool volume: 2470 gal, total flow rate: 112 GPM 2470 gal/112 gpm/60 = Turnover period: 37 minutes.)
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?