Skip to content
Loading map…

Stillwater Home Owners Association - Water Spray Park

2110 201 Street NW Edmonton AB T6M 0X6 · Aquatic Facility

Inspection summary

Stillwater Home Owners Association - Water Spray Park has been inspected 3 times by Alberta Health Services (Environmental Public Health) since May 15, 2024. The most recent inspection, on June 4, 2026, recorded 1 infraction.

2 of 3 inspections on record found no infractions at all. In the past 12 months there was 1 inspection with 1 infraction recorded. The higher-risk findings here relate to: Pool and spa water quality.

What these findings mean

Health authorities word their findings differently, so we group them by what they mean for the people using the facility. Higher-risk findings are the ones that could directly cause illness or injury, such as water that is not properly treated.

  • Pool and spa water qualityHigher risk

    For pools, spas and splash pads, inspectors test disinfectant levels, pH and water clarity, and check safety equipment. Water that is not properly treated can spread skin, ear and stomach infections.

    Recorded once on June 4, 2026. For example: Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?

About this data

These results come from Alberta Health Services (Environmental Public Health), which inspects food premises and other public facilities in this area. We republish the authority's public disclosure data and refresh it regularly; the official record is the final word.

3 inspections

  1. Monitoring Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Facility Parameters:Pool Volume: 1350 GallonsFilter area: 4.91 sq ftObserved: Filtration rate was calculated to be greater than 15 GPM/sq ft Flow rate: 80 GPMFiltration rate: 16.3 GPM/sq ft Turnover period: 16.9 minutes/hoursCorrection: Operator decreased flow rate during the inspection to decrease filtration rateFlow rate: 73 GPMFiltration rate: 14.9 GPM/sq ft Turnover period: 18.5 minutes/hours
  2. Monitoring Inspection

    0 infractions

  3. Monitoring Inspection

    0 infractions

Nearby inspected facilities

Own this business? Add a badge to your website