Skip to content
Loading map…

COBS Bread

1140 - 5235 Northland Drive NW Calgary AB T2L 2J8 · Food - General

7 inspections

  1. Risk Management Inspection

    0 infractions

  2. Monitoring Inspection

    1 infraction

    • 04. Does the operator use approved methods for cleaning and sanitizing equipment, utensils, and surfaces?
      • The concentration Quat sanitizer coming out of dispenser is measured below 200 ppm. Please re-calibrate dispenser. In the interim, manually add sanitizer to ensure Quat sanitizer solutions are used at 200 ppm.
  3. Monitoring Inspection

    1 infraction

    • 23. Is the facility maintained in a clean and sanitary condition?
      • Some buildup observed in the hard-to-reach areas of the facility. - Please plan to do a deep clean. Maintain in a clean and sanitary condition at all times.
  4. Risk Management Inspection

    1 infraction

    • 04. Does the operator use approved methods for cleaning and sanitizing equipment, utensils, and surfaces?
      • The concentration of freshly made Quat sanitizer from both Quat dispensers measured below 200 ppm. - Quats must be used at 200 ppm. Please calibrate. - In the interim, please mix manually to 200 ppm.
  5. Risk Management Inspection

    1 infraction

    • 04. Does the operator use approved methods for cleaning and sanitizing equipment, utensils, and surfaces?
      • The concentration of freshly made Quat sanitizer from one of the 2 Quat dispensers measured below or at 100 ppm. - Quats must be used at 200 ppm. Please calibrate.
  6. Demand Inspection

    0 infractions

  7. Initial Inspection

    2 infractions

    • 13. Are properly operating hand washing sink(s) accessible to food handlers, located in suitable areas, and stocked with appropriate hand washing supplies?
      • The wrong paper towel rolls were ordered/received. Ensure you the correct paper towel rolls available prior to opening date.
    • 22. Are utensils and equipment maintained in a condition and a manner that ensures the safe handling of food?
      • One of the oven glass panel was shattered during installation. Facility is going to change the panel out to a stainless or aluminum panel as a temporary solution. A replacement tempered glass will be installed in 3-4 weeks.