  1. Risk Management Inspection

    0 infractions

  2. Monitoring Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • To achieve a 15 minute turnover, the recirculation flow rate should be 107gpm. The current filters (two TA-60 Tagelus filters, have a maximum flow rate of 78gpm). Current flow is recorded in daily records as 50gpm (less than half of what is required). Pump curve of 3HP Whisperflo Pentair WFET-12 indicates more flow should be achievable (max 160gpm). ** Please provide our office with a written plan to improve both recirculation rate and filtration for this hot tub (plans should be completed by engineer or qualified individual).
  3. Demand Inspection

    2 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Aug 5/25; Sample positive for Pseudomonas.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • April 7/25; Sample had HPC of 180cfu/ml. Treat and resample.
  4. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • April 7/25; Sample had HPC of 180cfu/ml. Treat and resample.
  5. Monitoring Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • Initially chlorine was at 1.55ppm (heavy bather load) but rose to 3.5ppm during inspection. Ensure lag time on controller is set and turnover adequate to respond quickly to whirlpool conditions and keep chlorine at or above 2ppm at all times.
  6. Monitoring Inspection

    0 infractions