Skip to content
Loading map…

Fairmont Banff Springs - Willow Stream East Falls (Assiniboine)

405 Spray Avenue Banff AB T1L 1J4 · Aquatic Facility

16 inspections

  1. Monitoring Inspection

    1 infraction

    • 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
      • Three tiles missing on deck by skimmer furthest from the stairs. Staff aware of missing tiles and are in process of correcting.
  2. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample from Monday March 23rd, 2026, had an HPC of 210 CFU/ml. -Operators were informed to treat and submit a re-sample.
  3. Demand Inspection

    0 infractions

  4. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Feb.24/25; Sample positive for TC. Treat and resample, review sampling procedure.
  5. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Jan.21/25 Sample had an HPC of 120cfu/ml. Treat and resample.
  6. Monitoring Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • Chlorine level initially low (1.62ppm) but rose during inspection to adequate level (above 2ppm). Ensure controller is calibrated and lag time set appropriately to respond to any water quality issues.
  7. Demand Inspection

    5 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Apr.15/24; HPC 120 cfu/ml. Treat and resample.Water sample from March 25th, 2024, had an HPC of 190 CFU/mL. - Operators were informed to treat and re-sample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Aug 12/24 Sample had high HPC of 820cfu/ml.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Sept 16/24; HPC 130cfu/ml. Treat and resample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Nov.4/24; Sample has HPC of 450cfu/ml. Check systems and shock chlorinate.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Manually tested pH level (6.8) does not match set point on controller (7.4). Calibrate controller and ensure pH is consistent.
  8. Demand Inspection

    4 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Sept 16/24; HPC 130cfu/ml. Treat and resample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Apr.15/24; HPC 120 cfu/ml. Treat and resample.Water sample from March 25th, 2024, had an HPC of 190 CFU/mL. - Operators were informed to treat and re-sample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Aug 12/24 Sample had high HPC of 820cfu/ml.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Manually tested pH level (6.8) does not match set point on controller (7.4). Calibrate controller and ensure pH is consistent.
  9. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Aug 12/24 Sample had high HPC of 820cfu/ml.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Apr.15/24; HPC 120 cfu/ml. Treat and resample.Water sample from March 25th, 2024, had an HPC of 190 CFU/mL. - Operators were informed to treat and re-sample.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Manually tested pH level (6.8) does not match set point on controller (7.4). Calibrate controller and ensure pH is consistent.
  10. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Apr.15/24; HPC 120 cfu/ml. Treat and resample.Water sample from March 25th, 2024, had an HPC of 190 CFU/mL. - Operators were informed to treat and re-sample.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Manually tested pH level (6.8) does not match set point on controller (7.4). Calibrate controller and ensure pH is consistent.
  11. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample from March 25th, 2024, had an HPC of 190 CFU/mL. - Operators were informed to treat and re-sample.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Manually tested pH level (6.8) does not match set point on controller (7.4). Calibrate controller and ensure pH is consistent.
  12. Monitoring Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Manually tested pH level (6.8) does not match set point on controller (7.4). Calibrate controller and ensure pH is consistent.
  13. Demand Inspection

    6 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • October 16/23; HPC 240 cfu/ml. Treat and resample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Nov.20/2023; HPC 690cfu/ml. Treat and resample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • February 5/24; HPC 450 cfu/ml. Treat and resample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Feb.23/24; HPC 280cfu/ml. Treat and resample. Check systems.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Alkalinity measured at 48ppm. Ensure alkalinity is kept between 60 and 180ppm; sodium bicarbonate may need to be added more frequently.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Current anti-entrapment plan indicates there is one filter pump (66gpm), 1 jet pump (52gpm), and one waterfall pump (63gpm) and two interconnected suction outlets (main drains). If jet pump is working, this would exceed the flow rate currently specified on drain covers (max 125gpm). If there are only 2 outlets, each outlet cover would need to be able to handle 100% of the flow. When replacing covers in 2023, ensure they are replaced with covers that allow adequate flow and confirm drains are interconnected and serve filters, jets, and waterfall.
  14. Demand Inspection

    5 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • October 16/23; HPC 240 cfu/ml. Treat and resample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Nov.20/2023; HPC 690cfu/ml. Treat and resample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • February 5/24; HPC 450 cfu/ml. Treat and resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Alkalinity measured at 48ppm. Ensure alkalinity is kept between 60 and 180ppm; sodium bicarbonate may need to be added more frequently.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Current anti-entrapment plan indicates there is one filter pump (66gpm), 1 jet pump (52gpm), and one waterfall pump (63gpm) and two interconnected suction outlets (main drains). If jet pump is working, this would exceed the flow rate currently specified on drain covers (max 125gpm). If there are only 2 outlets, each outlet cover would need to be able to handle 100% of the flow. When replacing covers in 2023, ensure they are replaced with covers that allow adequate flow and confirm drains are interconnected and serve filters, jets, and waterfall.
  15. Demand Inspection

    4 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • October 16/23; HPC 240 cfu/ml. Treat and resample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Nov.20/2023; HPC 690cfu/ml. Treat and resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Alkalinity measured at 48ppm. Ensure alkalinity is kept between 60 and 180ppm; sodium bicarbonate may need to be added more frequently.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Current anti-entrapment plan indicates there is one filter pump (66gpm), 1 jet pump (52gpm), and one waterfall pump (63gpm) and two interconnected suction outlets (main drains). If jet pump is working, this would exceed the flow rate currently specified on drain covers (max 125gpm). If there are only 2 outlets, each outlet cover would need to be able to handle 100% of the flow. When replacing covers in 2023, ensure they are replaced with covers that allow adequate flow and confirm drains are interconnected and serve filters, jets, and waterfall.
  16. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • October 16/23; HPC 240 cfu/ml. Treat and resample.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Alkalinity measured at 48ppm. Ensure alkalinity is kept between 60 and 180ppm; sodium bicarbonate may need to be added more frequently.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Current anti-entrapment plan indicates there is one filter pump (66gpm), 1 jet pump (52gpm), and one waterfall pump (63gpm) and two interconnected suction outlets (main drains). If jet pump is working, this would exceed the flow rate currently specified on drain covers (max 125gpm). If there are only 2 outlets, each outlet cover would need to be able to handle 100% of the flow. When replacing covers in 2023, ensure they are replaced with covers that allow adequate flow and confirm drains are interconnected and serve filters, jets, and waterfall.