Skip to content
Loading map…

HEALTHY ORGANIC KIDS

955 W GRAND AVE, CHICAGO, IL 60642 · PRIVATE SCHOOL

3 inspections

  1. Canvass

    0 infractions

  2. License Re-Inspection

    2 infractions

    • 11. ADEQUATE NUMBER, CONVENIENT, ACCESSIBLE, DESIGNED, AND MAINTAINED
      • CORECTED. EXPOSED HAND WASHING SINKS IN PREP AREAS.
    • 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
      • CORRECTED.
  3. License

    8 infractions

    • 9. WATER SOURCE: SAFE, HOT & COLD UNDER CITY PRESSURE
      • INSTRUCTED TO PROVIDE HOT WATER TO ALL OF THE SINKS.
    • 11. ADEQUATE NUMBER, CONVENIENT, ACCESSIBLE, DESIGNED, AND MAINTAINED
      • INSTRUCTED TO INSTALL EXPOSED HANDWASHING SINKS PER CITY CODE TO THE PREP AND DISHWASHING AREA. MUST HAVE SOAP AND HAND SANITARY DEVICES.
    • 19. OUTSIDE GARBAGE WASTE GREASE AND STORAGE AREA; CLEAN, RODENT PROOF, ALL CONTAINERS COVERED
      • MUST OBTAIN A CONTRACT WITH A WASTE COMPANY WHO MUST ALSO PROVIDE CONTAINERS FOR THE OUTSIDE DUMPSTER AREA.
    • 21. * CERTIFIED FOOD MANAGER ON SITE WHEN POTENTIALLY HAZARDOUS FOODS ARE PREPARED AND SERVED
      • INSTRUCTED TO PROVIDE THE ORIGINAL CITY OF CHICAGO FOOD SANITATION CERTIFICATE(S) OR PROOF OF ENROLLMENT (MUST BE WITHIN 6 MONTHS) IN THE COURSE.
    • 24. DISH WASHING FACILITIES: PROPERLY DESIGNED, CONSTRUCTED, MAINTAINED, INSTALLED, LOCATED AND OPERATED
      • INSTRUCTED TO INSTALL A 3-COMPARTMENT SINK WITH A GREASE TRAP AND ATTACHED METAL DRAINBOARD PER CITY CODE.
    • 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
      • INSTRUCTED TO PROVIDE THE MISSING COVING TO THE DINING AREAS AND THROUGH OUT AS NEEDED.
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • INSTRUCTED TO FINISH INSTALLING THE DROP CEILING AND SEAL ALL OPENINGS AROUND ALL PIPES AND CONDUITS THROUGH OUT.
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • INSTRUCTED TO PROVIDE WORKING VENTILATION TO THE HOOD IN THE PREP AREAS AND TO ALL OF THE TOILET ROOMS.