Holiday Inn Express & Suites - Pool
1145 St. Albert Trail St. Albert AB T8N 7X1 · Aquatic Facility
23 inspections
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC counts were calculated at 1,630 CFU/mL.The pool operator was advised to resample.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC counts were calculated at 290 CFU/mL.The pool operator was advised to increase free chlorine levels.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
1 infraction
- 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
- Free chlorine levels of the basin were noted to be at 0.92 ppm. Please increase the free chlorine levels.
- 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
0 infractions
- Risk Management Inspection
0 infractions
- Demand Inspection
2 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Total Coliforms were present in the pool water sample.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count was noted to be at 330 CFU/mL.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Monitoring Inspection
0 infractions
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- ***HPC was 770 CFU for testing done April 9, 2025.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- ***Discussed that sample was not taken April 2, 2025. Regular staff was away ill. Recommended alternate staff be trained on sampling procedures for when regular staff is away.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- - Total Alkalinity- 50ppm.Remediation measures were done during inspection to increase total alkalinity.Ensure total alkalinity is maintained between 60-180pppm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
0 infractions
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count was calculated at 350 CFU/mL.The operator was advised to increase free chlorine levels.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
0 infractions
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count was calculated at 240 CGU/mL. The operator was advised to increase the free chlorine levels.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
0 infractions
- Risk Management Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Water sample result with a HPC Count of 300 CFU/mL was received. April 25, 2024HPC 20 CFU/mL
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Water sample result with a HPC Count of 300 CFU/mL was received.
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- Grouting/ tile filler was coming off in the corner of the swimming pool. Some of the pieces of filler could be found in the filter basket. Properly repair swimming pool grouting with material where the manufacturer's intended purpose is swimming pool surfaces.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
1 infraction
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- Grouting/ tile filler was coming off in the corner of the swimming pool. Some of the pieces of filler could be found in the filter basket. Properly repair swimming pool grouting with material where the manufacturer's intended purpose is swimming pool surfaces.
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count was noted to be at 1210 CFU/mL.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count was noted to be at 200 CFU/mL.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
0 infractions
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count was noted to be at 150 CFU/mL. The operator was advised to increase the free chlorine level of the pool.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count was noted to be at 1160 CFU/mL. The operator was advised to increase the free chlorine level of the pool.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
0 infractions