Millard Treatment Centre (WCB) - Pool
131 Airport Road NW Edmonton AB T5G 0W6 · Aquatic Facility
3 inspections
- Risk Management Inspection
0 infractions
- Monitoring Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The Lectronator went down last week. Pool staff have been manually feeding chlorine. Watson Pools is coming this week to install a new Lectronator unit.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Monitoring Inspection
0 infractions