Skip to content
Loading map…

Riverbend Estates - Swimming Pool

5045 Whitemud Road NW Edmonton AB T6H 4Y7 · Aquatic Facility

Inspection summary

Riverbend Estates - Swimming Pool has been inspected 8 times by Alberta Health Services (Environmental Public Health) since June 17, 2024. The most recent inspection, on July 3, 2026, found no infractions.

6 of 8 inspections on record found no infractions at all. In the past 12 months there were 4 inspections with 1 infraction recorded. The higher-risk findings here relate to: Pool and spa water quality.

The number of infractions per inspection has stayed roughly the same over time.

What these findings mean

Health authorities word their findings differently, so we group them by what they mean for the people using the facility. Higher-risk findings are the ones that could directly cause illness or injury, such as water that is not properly treated.

  • Pool and spa water qualityHigher risk

    For pools, spas and splash pads, inspectors test disinfectant levels, pH and water clarity, and check safety equipment. Water that is not properly treated can spread skin, ear and stomach infections.

    Recorded 2 times across 2 separate inspections, most recently on June 16, 2026. For example: Is the bacteriological quality of the water in this pool satisfactory (Critical)?

About this data

These results come from Alberta Health Services (Environmental Public Health), which inspects food premises and other public facilities in this area. We republish the authority's public disclosure data and refresh it regularly; the official record is the final word.

8 inspections

  1. Risk Management Inspection

    0 infractions

  2. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • the microbiological water sample 26EN-163E00114 submitted on June 12, 2026, was unsatisfactory: Total coliforms were present.
  3. Risk Management Inspection

    0 infractions

  4. Monitoring Inspection

    0 infractions

  5. Risk Management Inspection

    0 infractions

  6. Monitoring Inspection

    0 infractions

  7. Risk Management Inspection

    0 infractions

  8. Monitoring Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The turnover period was 9.65 hours based on a volume of 28950 gallons and flow rate 50 gpm (need flow rate 80-85 gpm). After the flow rate adjustment, the turnover period became 6 hours based on a volume of 28950 gallons and flow rate 80 gpm.

Nearby inspected facilities

Own this business? Add a badge to your website