  1. Risk Management Inspection

    0 infractions

  2. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • the sample 25EN-289E00740 submitted on October 16, 2025, was unsatisfactory: HPC 220.
  3. Demand Inspection

    0 infractions

  4. Risk Management Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • With flow rate 80 gpm, the rate of filtration was 16.33 gpm/ft2. To ensure that the filtration rate does not exceed maximum allowed 15 gpm/ft2, the flow rate should not exceed 73 gpm. Note: according to the provided information, filter flow rate should be 50 gpm (see notes).
  5. Risk Management Inspection

    2 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • With flow rate 80 gpm, the rate of filtration was 16.33 gpm/ft2. To ensure that the filtration rate does not exceed maximum allowed 15 gpm/ft2, the flow rate should not exceed 73 gpm. Note: according to the provided information, filter flow rate should be 50 gpm (see notes).
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • An updated anti-entrapment compliance plan assessing the entrapment risks must be developed and available for review. Develop a new anti-entrapment compliance plan reflecting the updated equipment and submit the plan for review to Environmental Public Health.
  6. Risk Management Inspection

    3 infractions

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • Free chlorine residual was 0.34 ppm, which is below the required level. Ensure that the free chlorine is maintained within required parameters. Updated on March 3, 2025:Free Chlorine was 0.2 ppm.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • With flow rate 80 gpm, the rate of filtration was 16.33 gpm/ft2. To ensure that the filtration rate does not exceed maximum allowed 15 gpm/ft2, the flow rate should not exceed 73 gpm. Note: according to the provided information, filter flow rate should be 50 gpm (see notes).
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • An updated anti-entrapment compliance plan assessing the entrapment risks must be developed and available for review. Develop a new anti-entrapment compliance plan reflecting the updated equipment and submit the plan for review to Environmental Public Health.
  7. Monitoring Inspection

    4 infractions

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • Free chlorine residual was 0.34 ppm, which is below the required level. Ensure that the free chlorine is maintained within required parameters.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • With flow rate 80 gpm, the rate of filtration was 16.33 gpm/ft2. To ensure that the filtration rate does not exceed maximum allowed 15 gpm/ft2, the flow rate should not exceed 73 gpm. Note: according to the provided information, filter flow rate should be 50 gpm (see notes).
    • 12. Are the general safety devices and physical conditions in this pool providing a safe environment (Critical)?
      • The main drains covers expired on December 19, 2024. Replace the covers.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • An updated anti-entrapment compliance plan assessing the entrapment risks must be developed and available for review. Develop a new anti-entrapment compliance plan reflecting the updated equipment and submit the plan for review to Environmental Public Health.
  8. Risk Management Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • With flow rate 80 gpm, the rate of filtration was 16.33 gpm/ft2. To ensure that the filtration rate does not exceed maximum allowed 15 gpm/ft2, the flow rate should not exceed 73 gpm. Note: according to the provided information, filter flow rate should be 50 gpm (see notes).
  9. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • the sample 24EN-194E00109 submitted on July 12, 2024, was unsatisfactory: HPC 720
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • With flow rate 80 gpm, the rate of filtration was 16.33 gpm/ft2. To ensure that the filtration rate does not exceed maximum allowed 15 gpm/ft2, the flow rate should not exceed 73 gpm. Note: according to the provided information, filter flow rate should be 50 gpm (see notes).
  10. Risk Management Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • With flow rate 80 gpm, the rate of filtration was 16.33 gpm/ft2. To ensure that the filtration rate does not exceed maximum allowed 15 gpm/ft2, the flow rate should not exceed 73 gpm. Note: according to the provided information, filter flow rate should be 50 gpm (see notes).
  11. Monitoring Inspection

    2 infractions

    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • There were no records of testing the secondary layer of anti-entrapment protection device available. The testing was conducted during the inspection. Ensure that the device is tested as per manufacturer's instructions, and the results of testing are recorded.
    • 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
      • * Rate of filtration for the filtration system could not be determined - a new filter was installed, and no information regarding a filtration area was provided.* A new disinfection system was installed (Pulsar Infinity pack system) but no information regarding the alteration was submitted to AHS.
  12. Risk Management Inspection

    1 infraction

    • 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
      • * Rate of filtration for the filtration system could not be determined - a new filter was installed, and no information regarding a filtration area was provided.* A new disinfection system was installed (Pulsar Infinity pack system) but no information regarding the alteration was submitted to AHS.