  1. Canvass

    1 infraction

    • 51. PLUMBING INSTALLED; PROPER BACKFLOW DEVICES
      • OBSERVED HAND SINK ON LEFT SIDE WITH NO HOT WATER LOCATED IN BOYS TOILET ROOM (SOUTH). INSTRUCTED TO REPAIR.
  2. Canvass

    0 infraction

  3. Canvass

    0 infraction

  4. Canvass

    1 infraction

    • 54. GARBAGE & REFUSE PROPERLY DISPOSED; FACILITIES MAINTAINED
      • INSTRUCTED TO BETTER MAINTAIN OUTDOOR GARBAGE DUMPSTER ENCLOSURE AND REMOVE BUILDING MATERIALS AND PALLETS DUE TO POTENTIAL PEST HARBORAGE.
  5. Canvass

    0 infraction

  6. Canvass Re-Inspection

    0 infraction

  7. Canvass

    3 infractions

    • 5. PROCEDURES FOR RESPONDING TO VOMITING AND DIARRHEAL EVENTS
      • FOUND NO PROCEDURE/PLAN FOR RESPONDING TO VOMITING AND DIARRHEAL EVENTS ON SITE. INSTRUCTED TO PROVIDE AND MAINTAIN REQUIRED PROCEDURE/PLAN AND APPROPRIATE SUPPLIES OR KIT AS REQUIRED. (NECESSARY ITEMS AT A MINIMUM: GLOVES, FACE MASKS, DISPOSABLE MOPS AND APPROPRIATE SANITIZER/SPRAY THAT IS EFFECTIVE AGAINST NOROVIRUS). PRIORITY FOUNDATION VIOLATION 7-38-005,NO CITATION ISSUED.(CPS).
    • 56. ADEQUATE VENTILATION & LIGHTING; DESIGNATED AREAS USED
      • INSTRUCTED TO REMOVE EXCESSIVE ACCUMULATION OF DUSTS ON WALL VENTILATION COVER NEAR THE 3-COMPARTMENT SINK AREA.
    • 60. PREVIOUS CORE VIOLATION CORRECTED
      • PREVIOUS CORE VIOLATION NOT CORRECTED FROM INSPECTION REPORT# 2373264 DATED:05/29/2020 #55--INSTRUCTED TO REMOVE PEELING PAINT ON CEILING AND WALLS INSIDE DINING AREA. Aug 29, 2020 INSTRUCTED TO CORRECT NOTED VIOLATION AND MAINTAIN BY 3/17/2021. PRIORITY FOUNDATION VIOLATION 7-42-090,NO CITATION ISSUED.(CPS).
  8. Canvass

    1 infraction

    • 55. PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
      • INSTRUCTED TO REMOVE PEELING PAINT ON CEILING AND WALLS INSIDE DINING AREA.
  9. Canvass

    4 infractions

    • 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE
      • OBSERVED HAND DRYING PAPER TOWELS DEPLETED AT BOY'S AND GIRL'S RESTROOMS AT SOUTH SIDE OF BUILDING.ENGINEER PROMPTLY REPLENISHED TOWL DISPENSERS. PRIORITY FOUNDATION VIOLATION 7-38-030(c) NO CITATION ISSUED.
    • 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE
      • OBSERVED EXPOSED HANDSINK NO ACCESSIBLE AT THREE COMPARTMENT SINK AREA.INSTRUCTED MANAGEMENT TO INSTALL A EXPOSED HANDSINK NEAR THREE COMPARTMENT SINK. CORE VIOLATION
    • 48. WAREWASHING FACILITIES: INSTALLED, MAINTAINED & USED; TEST STRIPS
      • OBSERVEDNO DRAINBOARD AT THREE COMPARTMENT SINK.INSTRUCTED MANAGEMENT TO INSTALL A DRAINBOARD OVER THE THREE COMPARTMENT SINK. CORE VIOLATION
    • 55. PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
      • OBSERVED PEELING PAINT FRON CEILING AT BOY'S AND GIRL'S RESTROOMS AT NORTH AND SOUTH AREA OF THE BUILDING.INSTRUCTED MANAGEMENT TO REPAIR CEILING'S. CORE VIOLATION
  10. Canvass

    4 infractions

    • 32. FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED
      • INSTRUCTED TO ELEVATE MOP IN BETWEEN USE FOR SANITARY PURPOSES.
    • 32. FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED
      • INSTRUCTED TO DETAIL CLEAN THE GASKETS AROUND THE REACH-IN MILK REFRIGERATOR TO REMOVE BUILDUP AND MAINTAIN.
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • OBSERVED DETERIORATING PAINT ABOVE THE STALL OF THE WOMEN'S FACULTY WASHROOM ON THE 1ST FLOOR. INSTRUCTED TO REMOVE ALL DETERIORATION AND RESURFACE THE CEILING TO PROVIDE A SMOOTH, EASILY CLEANABLE SURFACE.
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • MUST INCREASE THE HOT WATER PRESSURE IN THE 2ND SINK, 1ST FLOOR BOYS STUDENT WASHROOM AND MAINTAIN TO PROVIDE HOT AND COLD RUNNING WATER UNDER CITY PRESSURE.
  11. Canvass

    2 infractions

    • 33. FOOD AND NON-FOOD CONTACT EQUIPMENT UTENSILS CLEAN, FREE OF ABRASIVE DETERGENTS
      • INSTRUCTED TO CLEAN AND MAINTAIN COUNTER/STORAGE SHELVES WITH DUST BUILD-UP IN FRONT SERVICE LINE.
    • 41. PREMISES MAINTAINED FREE OF LITTER, UNNECESSARY ARTICLES, CLEANING EQUIPMENT PROPERLY STORED
      • INSTRUCTED TO DETAIL CLEAN AND MAINTAIN REAR OUTSIDE AREA (BY GARBAGE AREA). NOTED SOME DEBRIS AND DRIED LEAVES ON GROUND.
  12. Canvass

    2 infractions

    • 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
      • FLOOR KITCHEN AREA BY GARBAGE CONTAINER NOT CLEAN, INSTRUCTED TO CLEAN DAILY, AND FLOOR THROUGHOUT BOILER DUSTY, INSTRUCTED TO CLEAN,
    • 41. PREMISES MAINTAINED FREE OF LITTER, UNNECESSARY ARTICLES, CLEANING EQUIPMENT PROPERLY STORED
      • CLUTTER IN BASEMENT BOILER AREA, INSTRUCTED TO REMOVE AL CLUTTER, CLEAN AND BETTER MAINTAIN,
  13. Canvass

    1 infraction

    • 32. FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED
      • INSTRUCTED TO PROVIDE PROPER RAISED SHELVES 6" OFF THE FLOOR FOR EASY ACCESS ON CLEANING. NOTED MILK CRATES IS USED AS STORAGE SHELVES IN PREP/DINING AREA.
  14. Canvass

    4 infractions

    • 32. FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED
      • Kitchen Manual can opener is not clean.Instructed manager to clean and sanitize daily.
    • 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
      • Floor in basement boiler room not cleaned or maintained. Instructed to detail clean and remove excessive water. (Engineer is made aware).
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • Walls with cracks water seepage on wall foundations in various areas of the boiler room.Must repair and maintain.(Engineer made aware). East upper wall in the gymnasium is in poor repair must be repaired to smooth,easily cleanable surfaces.(Engineer made aware). Scattered sites of peeling paint in classroom#212,hallway areas,girls toilet room 2nd flr Must remove(Engineer made aware).
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • Remove dusts accumulations from the ventilation covers throughout the classrooms,hallways,student toilet rooms(Engineer made aware).
  15. Canvass

    5 infractions

    • 32. FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED
      • Reach in cooler shelving/racks that had peeling paint/rust, shall be reapired/replaced.
    • 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
      • Floors in boiler room area that had seepage, standing water, and green mildew in tunnel area, shall be repaired/ sealed cleaned and sanitized. Floors in School storage bsmt need detailed cleaning.
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • Walls that had exposed plaster, peeling paint in kitchen prep area, lunchroom, shall be repaired/sealed. Walls ceilings that had peeling paint in classroom#111, hallway, and staircase (1st floor, 2nd floor), shall be repaired/sealed.
    • 36. LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
      • Broken light shields in classrooms #02,#03,#04, in annex building, shall be replaced. Light shields in classrooms 1st floor, 2nd floor in scholl building not clean, need cleaning.
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • Exhaust vents(ventilation) in cooler not clean, needs cleaning. Exhaust vents(ventilation) in bathrooms, 1st, 2nd floors, and annex building not clean, need detailed cleaning.
  16. Canvass

    3 infractions

    • 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
      • 2nd floor boy's bathroom not clean, needs cleaning, floors in bsmt storage areas, storage room not clean, need detailed cleaning(corners).
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • Walls, ceilings that had peeling paint in classrooms #'s 211, 212, 208, shall be repaired/sealed.
    • 36. LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
      • Light shields that were damaged/missing in 2nd floor classrooms, shall be replaced.
  17. Canvass

    3 infractions

    • 33. FOOD AND NON-FOOD CONTACT EQUIPMENT UTENSILS CLEAN, FREE OF ABRASIVE DETERGENTS
      • All food and non-food contact surfaces of equipment and all food storage utensils shall be thoroughly cleaned and sanitized daily.EXTERIOR GREASE TRAP UNCLEAN MUST CLEAN AND MAINTAIN
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • The walls and ceilings shall be in good repair and easily cleaned. DAMAGED BASE WALLS UNDER WASHBOWL SINKS IN BOY'S WASHROOM 2ND FLR MUST BE REPAIRED;
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • The flow of air discharged from kitchen fans shall always be through a duct to a point above the roofline. VENTILATION IN BOY'S WASHROOM ANNEX NOT WORKING,MUST BE REPAIRED
  18. Canvass

    3 infractions

    • 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
      • Floor in basement not cleaned or maintained. Instructed to detail clean and remove excessive water.
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • Walls and ceiling not maintained through out. Instructed to remove chipped paint in toilet rooms, hallway, gym room, cafeteria and classroom and repair and reseal walls. Walls in boiler room not maintained. Instructed to repair walls to prevent water seepage. Ventilation covers in annex toilet room not cleaned. Instructed to detail clean.
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • Water pressure low in girl's first first toilet room. Instructed to have water running longer at faucet.
  19. Canvass

    5 infractions

    • 32. FOOD AND NON-FOOD CONTACT SURFACES PROPERLY DESIGNED, CONSTRUCTED AND MAINTAINED
      • All food and non-food contact equipment and utensils shall be smooth, easily cleanable, and durable, and shall be in good repair. AIR FAN/VENTS INSIDE 2 DOOR REFRIGERATOR UNCLEAN,MUST BE CLEAN AND MAINTAIN; WEATHER STRIP OF (1) ENTRANCE DOOR IN ANNEX BLDG MUST BE ADJUSTED OR PROVIDE ADDITIONAL STRIP TO SEAL LITTLE OPENINGS
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • The walls and ceilings shall be in good repair and easily cleaned. PEELING PAINT ON WALLS UNDER WASHBOWL SINKS AND URINAL IN GIRL'S AND BOY'S WASHROOM IN 1ST AND 2ND FLOORS MUST BE REMOVED /PAINT WITH NON TOXIC
    • 36. LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
      • All rooms in which food or drink is prepared, or in which utensils are washed, shall be lighted so that a minimum of 50-foot candles of light is available on all work surfaces. MUST PROVIDE LIGHT IN GIRL'S WASHROOM 1ST FLOOR
    • 37. TOILET ROOM DOORS SELF CLOSING: DRESSING ROOMS WITH LOCKERS PROVIDED: COMPLETE SEPARATION FROM LIVING/SLEEPING QUARTERS
      • Toilet rooms shall be completely enclosed and shall be vented to the outside air or mechanically ventilated. GIRL'S AND BOY'S TOILET IN 1ST AND 2ND FLOORS WITHOUT DOORS,INSTRUCTED TOILETS MUST HAVE SELF CLOSING DOORS
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • Ventilation: All plumbing fixtures, such as toilets, sinks, washbasins, etc., must be adequately trapped, vented, and re-vented and properly connected to the sewer in accordance with the plumbing chapter of the Municipal Code of Chicago and the Rules and Regulations of the Board of Health. 2 FAUCET IN BOY'S WASHROOM 1ST AND 2ND FLOOR IN POOR REPAIR ,MUST BE FIXED; VENTS IN BOY'S WASHROOM ANNEX SIDE UNCLEAN,MUST BE CLEAN AND MAINTAIN