Aller au contenu
Chargement de la carte…

Hawthorne Elementary

3319 N Clifton AVE, CHICAGO, IL 60657 · School

18 inspections

  1. Canvass

    3 infractions

    • 44. UTENSILS, EQUIPMENT & LINENS: PROPERLY STORED, DRIED, & HANDLED
      • NOTED EMPTY METAL FOOD RACKS BEING STORED IN THE STAFF WASHROOM. MANAGER REMOVED DURING THE INSPECTION.
    • 45. SINGLE-USE/SINGLE-SERVICE ARTICLES: PROPERLY STORED & USED
      • NOTED BOTTLED WATER STORED ON THE FLOOR IN THE DRY FOOD STORAGE ROOM. MANAGER REMOVED DURING THE INSPECTION.
    • 55. PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
      • MISSING FLOOR DRAIN COVER IN THE DRY FOOD STORAGE ROOM. MUST REPLACE.
  2. Canvass

    2 infractions

    • 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE
      • GIRLS WASHROOMS ON BOTH 1ST AND 2ND FLOORS HANDWASH BOWLS HOT AND COLD PUSH BUTTONS NOT MAINTAINED, LESS THAN 15 SECONDS RUNNING WATER TIME. INSTRUCTED MUST RECALIBRATE SAID WASHROOMS HANDWASH BOWLS HOT AND COLD WATER PUSH BUTTONS TO A MINIMAL 15 SECONDS RUNNING WATER TIME.
    • 38. INSECTS, RODENTS, & ANIMALS NOT PRESENT
      • OBSERVED 1/4 INCH GAP AT ENTRANCE/EXIT DOOR SWEEP #5. MUST RODENT PROOF SAID DOOR.
  3. Canvass

    5 infractions

    • 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE
      • NO HOT WATER IN THE GIRL'S WASHROOMS. HOT WATER TEMPERATURE FOUND AT 45.9F TO 55.7F. MUST PROVIDE HOT WATER WITH A MINIMUM TEMPERATURE OF 100F AT ALL WASHBOWLS. ADEQUATE HOT WATER FOUND AT ALL OTHER SINKS.INSTRUCTED TO USE OTHER WASHROOMS. PRIORITY VIOLATION 7-38-030(C) ENGINEER ON SITE ABLE TO FIX THE PROBLEM PRESENTLY HOT WATER AT TEMP OF 100.5
    • 47. FOOD & NON-FOOD CONTACT SURFACES CLEANABLE, PROPERLY DESIGNED, CONSTRUCTED & USED
      • MUST NOT USE MILK CRATES AS A MEANS OF ELEVATION FOR STORED ITEMS.PROVIDE SHELVES.
    • 49. NON-FOOD/FOOD CONTACT SURFACES CLEAN
      • ALL RAW WOODEN SHELVING AT FOOD STORAGE AREA IN THE PREP AREA NOT SMOOTH AND EASILY CLEANABLE.SURFACE MUST BE SMOOTH AND EASILY CLEANABLE. REMOVED STUCKED CARDBOARDS INSIDE THE TWO DOOR REACH-IN COOLER INSIDE OFFICE/STORAGE(WEST WALL).
    • 53. TOILET FACILITIES: PROPERLY CONSTRUCTED, SUPPLIED, & CLEANED
      • NO LID COVERS FOR RECEPTACLES IN GIRLS WASHROOMS.MUST PROVIDED.
    • 55. PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
      • WALL CAULKING ALONG THE WASHBOWL IN THE BOYS/GIRLS WASHROOMS IN POOR REPAIR, CRACKED/DAMAGED. MUST REPLACE.
  4. Canvass

    0 infraction

  5. Canvass

    2 infractions

    • 49. NON-FOOD/FOOD CONTACT SURFACES CLEAN
      • MUST NOT USE CLOTH TOWELS AS LINER FOR THE THREE COMPARTMENT SINK GREASE TRAP. MUST BE A SMOOTH, CLEANABLE SURFACE.
    • 51. PLUMBING INSTALLED; PROPER BACKFLOW DEVICES
      • SLOW DRAINING HANDWASHING SINK ON THE SERVICE/COOKS LINE.----UTILITY SERVICE SINK IN HALLWAY CLOSET AJACENT TO THE LUNCHROOM NOT DRAINING WITH STANDING WASTE WATER. INSTRUCTED TO REPAIR ALL TO PROPERLY DRAIN.
  6. Canvass

    2 infractions

    • 10. ADEQUATE HANDWASHING SINKS PROPERLY SUPPLIED AND ACCESSIBLE
      • GIRLS WASHROOMS ON BOTH 1ST AND 2ND FLOORS HANDWASH BOWLS HOT AND COLD PUSH BUTTONS NOT MAINTAINED, LESS THAN 15 SECONDS RUNNING WATER TIME. INSTRUCTED MUST RECALIBRATE SAID WASHROOMS HANDWASH BOWLS HOT AND COLD WATER PUSH BUTTONS TO A MINIMAL 15 SECONDS RUNNING WATER TIME.
    • 51. PLUMBING INSTALLED; PROPER BACKFLOW DEVICES
      • 3-COMPARTMENT SINK PIPE DRAINING SLOWLY. INSTRUCTED MANAGER 3-COMPARTMENT SINK PIPE MUST DRAIN QUICKLY.
  7. Canvass

    1 infraction

    • 55. PHYSICAL FACILITIES INSTALLED, MAINTAINED & CLEAN
      • NOTED HOLE ON WALL BETWEEN STALLS OF THE BOYS BATHROOM ON THE FIRST FLOOR. INSTRUCTED TO REPAIR AND MAINTAIN.
  8. Canvass Re-Inspection

    0 infraction

  9. Canvass

    1 infraction

    • 29. PREVIOUS MINOR VIOLATION(S) CORRECTED 7-42-090
      • PREVIOUS VIOLATIONS NOT CORRECTED FROM REPORT DATED 1-30-17. INSPECTION# 1982277. MUST INCREASE THE RUN TIME TO AT LEAST 15 SECONDS ON THE SELF CLOSING FAUCETS IN THE FOLLOWING AREAS: THE 1ST FLOOR GIRLS RESTROOM, THE BASEMENT BOYS RESTROOM AND THE 2ND FLOOR BOYS RESTROOM. ONE OF THE TWO HANDSINKS IN THE BOYS 2ND FLOOR BATHROOM DOES NOT HAVE HOT WATER. INSTRUCTED TO PROVIDE HOT WATER AT ALL HAND SINKS AND TO USE THE OTHER AVAILABLE SINK UNTIL PROVIDED. SERIOUS VIOLATION. 7-42-090.
  10. Canvass

    1 infraction

    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • THE EXPOSED HAND SINK IN THE COOK LINE IS LEAKING FROM THE FAUCET. INSTRUCTED TO REPAIR THE LEAK. MUST INCREASE THE RUN TIME TO AT LEAST 15 SECONDS ON THE SELF CLOSING FAUCETS IN THE FOLLOWING AREAS: THE 1ST FLOOR GIRLS RESTROOM, THE BASEMENT BOYS RESTROOM AND THE 2ND FLOOR BOYS RESTROOM. ONE OF THE TWO HANDSINKS IN THE BOYS 2ND FLOOR BATHROOM DOES NOT HAVE HOT WATER. INSTRUCTED TO PROVIDE HOT WATER AT ALL HAND SINKS AND TO USE THE OTHER AVAILABLE SINK UNTIL PROVIDED.
  11. Canvass

    2 infractions

    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • PEELING PAINT AT THE SOAP DISPENSER OF THE PREP AREA EXPOSED HAND SINK. MUST REPAIR/REMOVE.
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • ONE OF THE TWO WASHBOWLS IN THE LOWER LEVEL BOYS WASHROOM WITHOUT HOT WATER. MUST PROVIDE.
  12. Canvass

    3 infractions

    • 33. FOOD AND NON-FOOD CONTACT EQUIPMENT UTENSILS CLEAN, FREE OF ABRASIVE DETERGENTS
      • OBSERVED DIRT BUILDUP ON TABLE UNDER SLICER AND ON FANGUARD IN THE FRONT 2 DOOR REFRIGERATOR. INSTRUCTED FACILITY TO CLEAN AFFECTED AREAS AND TO MAINTAIN.
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • OBSERVED PEELING PAINT THROUGHOUT BUILDING (STAIRWAYS, LUNCHROOM WALLS, BATHROOMS). INSTRUCTED FACILITY TO REMOVE ALL PEELING PAINT AND RESEAL AND MAINTAIN.
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • OBSERVED LEAKS AT THE LEFT FAUCET HOT WATER HANDLE OF THE THREE COMPARTMENT SINK AND AT THE STOVE FAUCET. ALSO OBSERVED NO HOT WATER AT THE RIGHT SINK IN THE 2ND FLOOR GIRLS WASHROOM (ADDITIONAL SINK NEARBY). INSTRUCTED FACILITY TO REPAIR AND MAINTAIN.
  13. Canvass

    3 infractions

    • 34. FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVING INSTALLED, DUST-LESS CLEANING METHODS USED
      • BROKEN FLOOR TILES INSIDE BOYS WASHROOM IN BASEMENT MUST REPLACE.
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • NOTED CHIPPING AND PEELING PAINT ON CEILING INSIDE BOYS WASHROOM IN BASEMENT AND FIRST FLOOR. MUST SCRAPE AND REPAINT. FOUND OPENINGS INTO CEILING AND AROUND PIPE IN BOYS WASHROOM IN BASEMENT. MUST REPAIR/MAINTAIN.
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • HANDWASH SINKS IN TEACHERS WASHROOMS ARE DRAINING SLOW. MUST REPAIR/MAINTAIN. MUST REPAIR LEAKY HOT FAUCET HANDLE IN GIRLS 2ND FLOOR WASHROOM. MUST CLEAN FLOOR DRAINS IN KITCHEN FOOD PREP AREA AND INSIDE BOYS AND GIRLS WASHROOMS IN FIRST AND SECOND FLOOR.
  14. Canvass

    2 infractions

    • 31. CLEAN MULTI-USE UTENSILS AND SINGLE SERVICE ARTICLES PROPERLY STORED: NO REUSE OF SINGLE SERVICE ARTICLES
      • FOUND FOOD CONTAINERS NOT STORED PROPERLY ABOVE 3 COMPARTMENT SINK.(MUST STORE INVERTED)
    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • FOUND CHIPPING PAINT INSIDE RESTROOM WALLS. TEACHERS RESTROOM. 1ST FLOOR.
  15. Canvass

    1 infraction

    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • LEAKING "P" TRAP AT MIDDLE URINAL IN BOYS ROOM (1ST FLOOR). MUST REPAIR.
  16. Canvass

    2 infractions

    • 35. WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
      • The walls and ceilings shall be in good repair and easily cleaned. REPAIR PEELING PAINT FROM ABOVE THE EXPOSED HAND SINK IN KITCHEN.REMOVE SPIT BALLS ON CEILING AT 2ND FLOOR BOY'S WASHROOM.
    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • Ventilation: All plumbing fixtures, such as toilets, sinks, washbasins, etc., must be adequately trapped, vented, and re-vented and properly connected to the sewer in accordance with the plumbing chapter of the Municipal Code of Chicago and the Rules and Regulations of the Board of Health. MUST PROVIDE A BACK FLOW PREVENTER IN ALL MOP SINK IF GARDEN HOSE IS ATTACHED AND REMAINS ATTACHED. REPAIR MECHANICAL DRAIN HANDLE UNDER THE 3 COMPARTMENT SINK(SANITIZE COMPARTMENT),WHEN WATER IS RELEASED.
  17. Canvass

    0 infraction

  18. Canvass

    1 infraction

    • 38. VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
      • OBSERVED 1 OF 2 WASHROOM HANDSINKS WITHOUT HOT WATER IN THE 2ND FLOOR BOY'S RESTROOM. MUST REPAIR AND PUT SINK OUT OF ORDER UNTIL REPAIRED. MUST CAULK AROUND THE HANDSINK IN THE 2ND FLOOR GIRL'S RESTROOM.