  1. Monitoring Inspection

    0 infractions

  2. Risk Management Inspection

    0 infractions

  3. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample submitted on February 2, 2026 was not tested as it was written on the requisition form that it was taken on January 2, 2026. Resample to be submitted this week.
  4. Risk Management Inspection

    0 infractions

  5. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample that was indicated was taken on March 16/25 was not tested as the lab received it over 24 hours after collection. Wrong date was written on the requisition form. Resample to be submitted on Thursday.
  6. Risk Management Inspection

    0 infractions

  7. Monitoring Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Total alkalinity concentration was measured at 51 ppm.**Please ensure total alkalinity is kept between 60 - 180 ppm at all times.
  8. Monitoring Inspection

    1 infraction

    • 13. Are the general safety devices and physical conditions in this pool providing a safe environment (Non-Critical)?
      • The mat at the bottom of the slide was lifting at the corners. - Repair the mat, ensure that it does not present a tripping hazard for patrons.
  9. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample submitted on Dec. 11/23 was not tested as there was no id# on the bottle. New sample to be submitted this week.
    • 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
      • A rusted spot was observed on the side of the lazy river near the main drain at the end of the flowing section. Clean/repair noted section.