  1. Demand Inspection

    4 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample (26ES-150E00007) collected on May 29, 2026, was received by the lab on May 30, 2026. The sample was not tested as it was a non-urgent sample received during the weekend. Please submit another water sample for the swimming pool.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The swimming pool's temperature is routinely above 30 degrees C, however, the improper box is being checked on the water requisition form. Pseudomonas is not being checked for in this pool.REQUIREMENT: All basins in which the water temperature is routinely >30C must be indicated as such on the sample requisition form.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • **Ongoing Violation** Last inspection, it was discussed that: "the flow measured around 110 USGPM."The same concern was also noted this inspection.According to the operator, the flow rate on the pump cannot be adjusted; this was confirmed through the user manual of the pump. It was also noted that the maximum flow of the pump should not be reaching 110 USGPM, suggesting that there is an issue either with the pump or the flow meter.REQUIREMENT: The flow rate must be lowered. The pool operator should assess if the flow meter is damaged, and if so, to repair or replace it. If there is no known problem with the flow meter, then a new pump may be needed; please contact the Public Health Inspector if this happens.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • **Ongoing Violation** The anti-entrapment plan for this basin did not appear to have accurate information. The current plan indicates that there is one pump for the basin, however this system has two pumps.Based on the plumbing schematic, the two pumps appear to pull from different drains, and two separate plans may be required.REQUIREMENT: Review the anti-entrapment plan and ensure that the plans are accurately filled out.
  2. Risk Management Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The swimming pool's temperature is routinely above 30 degrees C, however, the improper box is being checked on the water requisition form. Pseudomonas is not being checked for in this pool.REQUIREMENT: All basins in which the water temperature is routinely >30C must be indicated as such on the sample requisition form.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • **Ongoing Violation** Last inspection, it was discussed that: "the flow measured around 110 USGPM."The same concern was also noted this inspection.According to the operator, the flow rate on the pump cannot be adjusted; this was confirmed through the user manual of the pump. It was also noted that the maximum flow of the pump should not be reaching 110 USGPM, suggesting that there is an issue either with the pump or the flow meter.REQUIREMENT: The flow rate must be lowered. The pool operator should assess if the flow meter is damaged, and if so, to repair or replace it. If there is no known problem with the flow meter, then a new pump may be needed; please contact the Public Health Inspector if this happens.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • **Ongoing Violation** The anti-entrapment plan for this basin did not appear to have accurate information. The current plan indicates that there is one pump for the basin, however this system has two pumps.Based on the plumbing schematic, the two pumps appear to pull from different drains, and two separate plans may be required.REQUIREMENT: Review the anti-entrapment plan and ensure that the plans are accurately filled out.
  3. Demand Inspection

    4 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The swimming pool's temperature is routinely above 30 degrees C, however, the improper box is being checked on the water requisition form. Pseudomonas is not being checked for in this pool.REQUIREMENT: All basins in which the water temperature is routinely >30C must be indicated as such on the sample requisition form.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The water sample collected on October 22, 2025, was unsatisfactory with the following results: HPC of 270 CFU/mL.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • **Ongoing Violation** Last inspection, it was discussed that: "the flow measured around 110 USGPM."The same concern was also noted this inspection.According to the operator, the flow rate on the pump cannot be adjusted; this was confirmed through the user manual of the pump. It was also noted that the maximum flow of the pump should not be reaching 110 USGPM, suggesting that there is an issue either with the pump or the flow meter.REQUIREMENT: The flow rate must be lowered. The pool operator should assess if the flow meter is damaged, and if so, to repair or replace it. If there is no known problem with the flow meter, then a new pump may be needed; please contact the Public Health Inspector if this happens.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • **Ongoing Violation** The anti-entrapment plan for this basin did not appear to have accurate information. The current plan indicates that there is one pump for the basin, however this system has two pumps.Based on the plumbing schematic, the two pumps appear to pull from different drains, and two separate plans may be required.REQUIREMENT: Review the anti-entrapment plan and ensure that the plans are accurately filled out.
  4. Risk Management Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The swimming pool's temperature is routinely above 30 degrees C, however, the improper box is being checked on the water requisition form. Pseudomonas is not being checked for in this pool.REQUIREMENT: All basins in which the water temperature is routinely >30C must be indicated as such on the sample requisition form.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • **Ongoing Violation** Last inspection, it was discussed that: "the flow measured around 110 USGPM."The same concern was also noted this inspection.According to the operator, the flow rate on the pump cannot be adjusted; this was confirmed through the user manual of the pump. It was also noted that the maximum flow of the pump should not be reaching 110 USGPM, suggesting that there is an issue either with the pump or the flow meter.REQUIREMENT: The flow rate must be lowered. The pool operator should assess if the flow meter is damaged, and if so, to repair or replace it. If there is no known problem with the flow meter, then a new pump may be needed; please contact the Public Health Inspector if this happens.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • **Ongoing Violation** The anti-entrapment plan for this basin did not appear to have accurate information. The current plan indicates that there is one pump for the basin, however this system has two pumps.Based on the plumbing schematic, the two pumps appear to pull from different drains, and two separate plans may be required.REQUIREMENT: Review the anti-entrapment plan and ensure that the plans are accurately filled out.
  5. Demand Inspection

    4 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The swimming pool's temperature is routinely above 30 degrees C, however, the improper box is being checked on the water requisition form. Pseudomonas is not being checked for in this pool.REQUIREMENT: All basins in which the water temperature is routinely >30C must be indicated as such on the sample requisition form.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample collected on April 30, 2025, had a HPC count of 320 CFU/ml, which is higher than the required limit. **Please begin treatment for the pool immediately. **Submit a re-sample after the treatment is completed and water chemistry is re-balanced.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • **Ongoing Violation** Last inspection, it was discussed that: "the flow measured around 110 USGPM."The same concern was also noted this inspection.According to the operator, the flow rate on the pump cannot be adjusted; this was confirmed through the user manual of the pump. It was also noted that the maximum flow of the pump should not be reaching 110 USGPM, suggesting that there is an issue either with the pump or the flow meter.REQUIREMENT: The flow rate must be lowered. The pool operator should assess if the flow meter is damaged, and if so, to repair or replace it. If there is no known problem with the flow meter, then a new pump may be needed; please contact the Public Health Inspector if this happens.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • **Ongoing Violation** The anti-entrapment plan for this basin did not appear to have accurate information. The current plan indicates that there is one pump for the basin, however this system has two pumps.Based on the plumbing schematic, the two pumps appear to pull from different drains, and two separate plans may be required.REQUIREMENT: Review the anti-entrapment plan and ensure that the plans are accurately filled out.
  6. Monitoring Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The swimming pool's temperature is routinely above 30 degrees C, however, the improper box is being checked on the water requisition form. Pseudomonas is not being checked for in this pool.REQUIREMENT: All basins in which the water temperature is routinely >30C must be indicated as such on the sample requisition form.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • **Ongoing Violation** Last inspection, it was discussed that: "the flow measured around 110 USGPM."The same concern was also noted this inspection.According to the operator, the flow rate on the pump cannot be adjusted; this was confirmed through the user manual of the pump. It was also noted that the maximum flow of the pump should not be reaching 110 USGPM, suggesting that there is an issue either with the pump or the flow meter.REQUIREMENT: The flow rate must be lowered. The pool operator should assess if the flow meter is damaged, and if so, to repair or replace it. If there is no known problem with the flow meter, then a new pump may be needed; please contact the Public Health Inspector if this happens.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • **Ongoing Violation** The anti-entrapment plan for this basin did not appear to have accurate information. The current plan indicates that there is one pump for the basin, however this system has two pumps.Based on the plumbing schematic, the two pumps appear to pull from different drains, and two separate plans may be required.REQUIREMENT: Review the anti-entrapment plan and ensure that the plans are accurately filled out.
  7. Demand Inspection

    3 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • The pool water sample collected on 2023-12-27 showed the presence of Total Coliforms per 100mL.Requirement: Please treat the pool water in accordance with AHS unsatisfactory water sample result and resample.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • **Ongoing Violation** Last inspection, it was discussed that: "the flow measured around 110 USGPM."The same concern was also noted this inspection.REQUIREMENT:The flow rate must be lowered. The pool operator should assess if the pool pump is variable speed and make adjustments that will ensure the system will operate safely.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • **Ongoing Violation** The anti-entrapment plan for this basin did not appear to have accurate information. The current plan indicates that there is one pump for the basin, however this system has two pumps.Based on the plumbing schematic, the two pumps appear to pull from different drains, and two separate plans may be required.REQUIREMENT: Review the anti-entrapment plan and ensure that the plans are accurately filled out.
  8. Monitoring Inspection

    2 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • **Ongoing Violation** Last inspection, it was discussed that: "the flow measured around 110 USGPM."The same concern was also noted this inspection.REQUIREMENT:The flow rate must be lowered. The pool operator should assess if the pool pump is variable speed and make adjustments that will ensure the system will operate safely.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • **Ongoing Violation** The anti-entrapment plan for this basin did not appear to have accurate information. The current plan indicates that there is one pump for the basin, however this system has two pumps.Based on the plumbing schematic, the two pumps appear to pull from different drains, and two separate plans may be required.REQUIREMENT: Review the anti-entrapment plan and ensure that the plans are accurately filled out.