612 111 Street SW - Whirlpool
612 111 Street SW Edmonton AB T6W 1R9 · Aquatic Facility
10 inspections
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- There was a discrepancy between the manual pH reading 7.4 (measured at the automated controller), and the automated controller reading pH 6.92 changing to 7.62 within few minutes. Please address. Updated on June 23, 2026:* There was a discrepancy between the automated controller reading for pH 7.21 and the manual reading pH 7.42 (PHI) and 7.4 (operator) (from the automated controller).
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Monitoring Inspection
2 infractions
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- There was a discrepancy between the manual pH reading 7.4 (measured at the automated controller), and the automated controller reading pH 6.92 changing to 7.62 within few minutes. Please address.
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- The water temperature was exceeding the maximum allowed temperature of 40C: the automated controller reading was 41.3C, and the manual reading was about 40.8C. Please address.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Risk Management Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total Alkalinity was 47 ppm.Updated on April 24, 2024:* Total alkalinity was 44 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm. Updated on April 30, 2025:* Total alkalinity was 29 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- the microbiological water sample 26EN-128E00196 submitted on May 8, 2026, was unsatisfactory: HPC 130.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total Alkalinity was 47 ppm.Updated on April 24, 2024:* Total alkalinity was 44 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm. Updated on April 30, 2025:* Total alkalinity was 29 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total Alkalinity was 47 ppm.Updated on April 24, 2024:* Total alkalinity was 44 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm. Updated on April 30, 2025:* Total alkalinity was 29 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- the sample 25EN-283E00196 submitted on October 10, 2025, was unsatisfactory: HPC 2770.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total Alkalinity was 47 ppm.Updated on April 24, 2024:* Total alkalinity was 44 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm. Updated on April 30, 2025:* Total alkalinity was 29 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
2 infractions
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total Alkalinity was 47 ppm.Updated on April 24, 2024:* Total alkalinity was 44 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm. Updated on April 30, 2025:* Total alkalinity was 29 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The turnover period was 23.35 minutes based on a volume of 2000 gallons and flow rate 85 gpm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total Alkalinity was 47 ppm.Updated on April 24, 2024:Total alkalinity was 44 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
2 infractions
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total Alkalinity was 47 ppm.Updated on April 24, 2024:Total alkalinity was 44 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 12. Are the general safety devices and physical conditions in this pool providing a safe environment (Critical)?
- 2 Waterways main drain covers (installed on May 1, 2017) expired on May 1, 2024. Ensure that the covers are replaced, and the new Anti-Entrapment Compliance Plan is submitted to our office.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
2 infractions
- 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
- The free chlorine level was 0.32 ppm (0.27 ppm from the automated controller probe chamber) with ORP 833 mV. The chlorine level was raised during the inspection (measured as 0.32/0.4/0.82 ppm).
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Total Alkalinity was 47 ppm.Updated on April 24, 2024:Total alkalinity was 44 ppm. Ensure that the total alkalinity is maintained between 60 and 180 ppm.
- 04. Is the chemical quality of the water in this pool satisfactory (Critical)?