  1. Risk Management Inspection

    0 infractions

  2. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • 1. Water sample collected on January 15, 2026, was present for total coliforms.
  3. Risk Management Inspection

    0 infractions

  4. Monitoring Inspection

    2 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • **CORRECTED**1. Mechanical room: The main drain valve was fully opened. Valve was adjusted to 30%.COMPLETE THE FOLLOWING:1. Valves from main drains should be opened no more than 30% to increase flow of water through the skimmers as the top portion of pool water contains the highest amount of contaminants.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • 1. The anti-entrapment plan indicates the drain covers were installed at the same time. One drain cover is VGB-2008 and the other is VGBA-2017.COMPLETE THE FOLLOWING:1. Ensure that the anti-entrapment plan is accurate and date of installation of covers is correct. Please provide reasoning for the difference in covers that were installed.
  5. Risk Management Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 70 GPM, and turnover period was calculated at 5 hours.-Please increase and maintain the pool flow rate between 80-85 GPM to ensure proper turnover for water disinfection and filtration.
  6. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • **UNSATISFACTORY WATER SAMPLE TEST RESULTS**1. The water sample collected on May 8, 2025, was unsatisfactory with an HPC of 420 CFU/mL. Another water sample must be collected and submitted immediately.2. The water sample collected on May 16, 2025, was unsatisfactory with an HPC of 1,690 CFU/mL. Another water sample must be collected and submitted immediately.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 70 GPM, and turnover period was calculated at 5 hours.-Please increase and maintain the pool flow rate between 80-85 GPM to ensure proper turnover for water disinfection and filtration.
  7. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The water sample collected on May 8, 2025, was unsatisfactory with an HPC of 420 CFU/mL. Another water sample must be collected and submitted immediately.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 70 GPM, and turnover period was calculated at 5 hours.-Please increase and maintain the pool flow rate between 80-85 GPM to ensure proper turnover for water disinfection and filtration.
  8. Risk Management Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 70 GPM, and turnover period was calculated at 5 hours.-Please increase and maintain the pool flow rate between 80-85 GPM to ensure proper turnover for water disinfection and filtration.
  9. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Pool water sample submitted on January 16, 2025, had Heterotrophic Plate Count (HPC) enumerated at 690 CFU/mL.-Please submit another water sample, ensure to follow proper sampling procedures to eliminate contamination, label as resample.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Sample submitted on January 21, 2025, showed that Heterotrophic Plate Count was enumerated at 2400 CFU/mL.-Please treat the pool according to AHS guidelines and submit another water sample, label as resample. A third consecutive water sample will result to the pool closure.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 70 GPM, and turnover period was calculated at 5 hours.-Please increase and maintain the pool flow rate between 80-85 GPM to ensure proper turnover for water disinfection and filtration.
  10. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Pool water sample submitted on January 16, 2025, had Heterotrophic Plate Count (HPC) enumerated at 690 CFU/mL.-Please submit another water sample, ensure to follow proper sampling procedures to eliminate contamination, label as resample.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 70 GPM, and turnover period was calculated at 5 hours.-Please increase and maintain the pool flow rate between 80-85 GPM to ensure proper turnover for water disinfection and filtration.
  11. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Pool water sample submitted on January 02, 2025, had Heterotrophic Plate Count (HPC) enumerated at 680 CFU/mL.-Please treat the pool in accordance with the AHS guidelines and submit another water sample, label as resample.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 70 GPM, and turnover period was calculated at 5 hours.-Please increase and maintain the pool flow rate between 80-85 GPM to ensure proper turnover for water disinfection and filtration.
  12. Risk Management Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 70 GPM, and turnover period was calculated at 5 hours.-Please increase and maintain the pool flow rate between 80-85 GPM to ensure proper turnover for water disinfection and filtration.
  13. Risk Management Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 55 GPM, and turnover period was calculated at 6.36 hours.-Please increase the pool flow rate to ensure proper turnover for water disinfection and filtration.
  14. Monitoring Inspection

    3 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Total Alkalinity was over 180 milligrams per litre.-Please reduce and maintain total alkalinity between 60-180 milligrams per litre.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Flow meter reading was 60 GPM, and turnover period was calculated at 5.83 hours.-Please increase the pool flow rate to ensure proper turnover for water disinfection and filtration.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • The pool's water alkalinity was not tested and documented weekly as required.-Please maintain regular water alkalinity testing and documentation as required.*Outstanding violation since 2023.
  15. Risk Management Inspection

    2 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The pool's flow meter was not working at the time of the inspection.-Please repair or replace the flow meter to ensure adequate turnover rate is maintained.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • The pool's water alkalinity was not tested and documented weekly as required.-Please maintain regular water alkalinity testing and documentation as required.
  16. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Pool sample submitted on August 29, 2024, showed that HPC could not be determined due to spreading form of bacterial growth.-Please treat the pool in accordance with the AHS guidelines and submit another sample after the treatment, label as resample.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The pool's flow meter was not working at the time of the inspection.-Please repair or replace the flow meter to ensure adequate turnover rate is maintained.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • The pool's water alkalinity was not tested and documented weekly as required.-Please maintain regular water alkalinity testing and documentation as required.
  17. Risk Management Inspection

    2 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The pool's flow meter was not working at the time of the inspection.-Please repair or replace the flow meter to ensure adequate turnover rate is maintained.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • The pool's water alkalinity was not tested and documented weekly as required.-Please maintain regular water alkalinity testing and documentation as required.
  18. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC was isolated at 170 CFU/mL.-Please treat the pool in accordance with AHS unsatisfactory pool sample and submit another sample after the treatment.-Please label the new sample as resample.
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The pool's flow meter was not working at the time of the inspection.-Please repair or replace the flow meter to ensure adequate turnover rate is maintained.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • The pool's water alkalinity was not tested and documented weekly as required.-Please maintain regular water alkalinity testing and documentation as required.
  19. Monitoring Inspection

    2 infractions

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • The pool's flow meter was not working at the time of the inspection.-Please repair or replace the flow meter to ensure adequate turnover rate is maintained.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • The pool's water alkalinity was not tested and documented weekly as required.-Please maintain regular water alkalinity testing and documentation as required.