Skip to content
Loading map…

Canalta St. Paul - Main Pool

5008 43 Street St. Paul AB T0A 3A2 · Aquatic Facility

13 inspections

  1. Monitoring Inspection

    0 infractions

  2. Monitoring Inspection

    1 infraction

    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Calculated turn over period is inadequate (6 hr). High turnover period causes pollution build-up in pool.Please fix the pool circulation system and ensure pool turn over around 4 hr.*Repeated violation 12/5/25
  3. Demand Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water sample 24EN-332E00408 has an HPC 340 CFU/mL. This could indicate a failure of the disinfection system. Please check the pools chemistry and ensure they are all within the acceptable parameters.
    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • PH is at 6.7. Low PH causes eye irritation, dry skin and irritation to swimmers. It also corrodes metal surfaces and pool accessories.Please adjust PH value within the range of 6.8 to 7.6
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Calculated turn over period is inadequate (6 hr). High turnover period causes pollution build-up in pool.Please fix the pool circulation system and ensure pool turn over around 4 hr.
  4. Monitoring Inspection

    3 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC 260 CFU/mL.Follow steps as per email shared.
    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • PH is at 6.7. Low PH causes eye irritation, dry skin and irritation to swimmers. It also corrodes metal surfaces and pool accessories.Please adjust PH value within the range of 6.8 to 7.6
    • 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
      • Calculated turn over period is inadequate (6 hr). High turnover period causes pollution build-up in pool.Please fix the pool circulation system and ensure pool turn over around 4 hr.
  5. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC 260 CFU/mL.Follow steps as per email shared.
  6. Risk Management Inspection

    0 infractions

  7. Monitoring Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC >57000 CFU/mL
  8. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC >57000 CFU/mL
  9. Risk Management Inspection

    0 infractions

  10. Monitoring Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC is at 130 CFU/mLHPC should be no greater than 100 CFU/mL
  11. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC is at 130 CFU/mLHPC should be no greater than 100 CFU/mL
  12. Monitoring Inspection

    0 infractions

  13. Risk Management Inspection

    0 infractions