  1. Risk Management Inspection

    0 infractions

  2. Risk Management Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Lab results indicate presents of PA in wave pool
  3. Risk Management Inspection

    0 infractions

  4. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Water sample collected on Tuesday August 6, shows a presence of total coliform bacteria.
  5. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Heterotrophic Plate Count is elevated (360 CFU/ml).[Sample collected April 22, 2026]
  6. Monitoring Inspection

    0 infractions

  7. Risk Management Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Total alkalinity measured 28 ppmEnsure Total alkalinity is with the range of 60-180 ppm.
  8. Risk Management Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  9. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC 1320 CFU/mL
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  10. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The HPC is slightly elevated (140 CFU/mL).Sampling was conducted on October 15, 2025.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  11. Demand Inspection

    3 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Recent water sample from June 24/25 came back with Pseudomonas isolated.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Recent water sample collected on June 24/25 came back with HPC 680 CFU/mL.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  12. Demand Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  13. Risk Management Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  14. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Water Sample Taken on April 8, 2025.HPC: 600 CFUSpoke to Operator.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  15. Monitoring Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  16. Risk Management Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  17. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • The sample was rejected.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  18. Monitoring Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • New anti-entrapment covers have been installed on pool basin accessible drains. Pipe dimensions, depths and orientation were not indicated on the anti-entrapment plan which determines the flow rate over the cover. Please ensure this is assessed and indicated at the next planned shut-down.
  19. Risk Management Inspection

    0 infractions

  20. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC was reported at 460 cfu/ml on October 11 (October 8 collection date).A sample collected in August showed elevated HPC (530 cfu/ml), but weekly sample results after the August sample were satisfactory.
  21. Demand Inspection

    2 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Total coliforms present in sample collected 20/08/2024.
    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC was reported as 510 cfu/ml
  22. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC was reported as 510 cfu/ml
  23. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Water sample collected on Tuesday August 6, shows a presence of total coliform bacteria.
  24. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Water sample collected on Monday, July 15, shows a presence of total coliform bacteria. Operator committed to treating the pool overnight.
  25. Risk Management Inspection

    0 infractions

  26. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • This week's sample showed a exceedance of HPC.
  27. Demand Inspection

    0 infractions

  28. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Elevated HPC reported (>100 cfu/ml)
  29. Risk Management Inspection

    0 infractions

  30. Risk Management Inspection

    0 infractions

  31. Monitoring Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Tot pool and lazy river main drain frames and covers have been replaced. Ultrasonic flow meter was used to calculate flow rates on drainpipes, where possible. Viewed anti-entrapment plan in the office. Operator is finalizing the anti-entrapment plan.
  32. Risk Management Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Plan is missing engineering and structural information such as drain dimensions and connections, pump information and flow rates. Maximum flow rates over drain covers cannot be determined without this information. Determine flow rates to size covers. Confirm piping/ connections (as-built drawings or field tests). A temporary management plan is in place to address unknowns, which includes: decreased suction over the main drains; an ultrasonic flow meter is ordered; main drain covers are monitored daily for breaks or structural issues.
  33. Risk Management Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Bacteria water samples collected on January 15 reports a high HPC count. A Water Contamination Response was implemented the next day.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Plan is missing engineering and structural information such as drain dimensions and connections, pump information and flow rates. Maximum flow rates over drain covers cannot be determined without this information. Determine flow rates to size covers. Confirm piping/ connections (as-built drawings or field tests). A temporary management plan is in place to address unknowns, which includes: decreased suction over the main drains; an ultrasonic flow meter is ordered; main drain covers are monitored daily for breaks or structural issues.
  34. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Bacteria water sample collected on January 4 and January 9 shows a high presence of HPC. Trend is downward but not satisfactory. Reviewed water chemistry. Re-sample scheduled Monday.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Plan is missing engineering and structural information such as drain dimensions and connections, pump information and flow rates. Maximum flow rates over drain covers cannot be determined without this information. Determine flow rates to size covers. Confirm piping/ connections (as-built drawings or field tests). A temporary management plan is in place to address unknowns, which includes: decreased suction over the main drains; an ultrasonic flow meter is ordered; main drain covers are monitored daily for breaks or structural issues.
  35. Demand Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Bacteria water sample collected on January 4th shows a high presence of HPC. Higher bather load that week. Pool supervisor is implementing a few adjustments to the pool circulation and backwashes to aim to improve disinfection. Reportedly, pool chemistry is satisfactory.
    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Plan is missing engineering and structural information such as drain dimensions and connections, pump information and flow rates. Maximum flow rates over drain covers cannot be determined without this information. Determine flow rates to size covers. Confirm piping/ connections (as-built drawings or field tests). A temporary management plan is in place to address unknowns, which includes: decreased suction over the main drains; an ultrasonic flow meter is ordered; main drain covers are monitored daily for breaks or structural issues.
  36. Demand Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • Plan is missing engineering and structural information such as drain dimensions and connections, pump information and flow rates. Maximum flow rates over drain covers cannot be determined without this information. Determine flow rates to size covers. Confirm piping/ connections (as-built drawings or field tests). Implement temporary management plan and replace expired covers.
  37. Demand Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The EID pool does not have a complete anti-entrapment plan. Plan is missing engineering and structural information such as drain dimensions and connections, pump information and flow rates. Maximum flow rates over drain covers cannot be calculated and determined without this information. Facility has contacted the engineering firm that assumed the company who drew the plans and is searching through archived folders. An inspection is scheduled to review plans with an AHS aquatics specialist during the third week of December
  38. Risk Management Inspection

    0 infractions

  39. Monitoring Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Thursday's bacteriological water samples were taken too early in the morning and fell outside of the 24-hour timeframe for processing. A re-sample was collected the following Monday.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Alkalinity initially measured 4 mg/L. Staff added Sodium Bicarbonate to the pool, admittedly, in the exact location the water is drawn from for testing. Second and third readings: 131 and 124 mg/L respectively.