Four Points by Sheraton Edmonton International Airport - Whirlpool
403 11 Avenue Nisku AB T9E 7N5 · Aquatic Facility
6 inspections
- Risk Management Inspection
0 infractions
- Monitoring Inspection
0 infractions
- Monitoring Inspection
0 infractions
- Monitoring Inspection
0 infractions
- Risk Management Inspection
0 infractions
- Monitoring Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Vol = 1571GalFilter surface area = 7.06sq.ftFlow rate = 60gpm***Turnover = 1571Gals/60gpm = 26 minutesFiltration rate = 60gpm/7.06sq.ft = 8.5gpm/sq.ft. The operator was directed to increase the flow rate to 79gpm. The operator later sent a picture of the flow meter showing the flow rate has been increased to 80gpm, thereby bringing the turnover to under 20 minutes as required.- All skimmers were equipped with floater weirs and adequate skimming was observed.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?