Hampton Inn & Suites - Hot Tub
3916 84 Avenue Leduc AB T9E 8M6 · Aquatic Facility
Inspection summary
Hampton Inn & Suites - Hot Tub has been inspected 15 times by Alberta Health Services (Environmental Public Health) since November 28, 2023. The most recent inspection, on October 8, 2026, found no infractions.
1 of 15 inspections on record found no infractions at all. In the past 12 months there were 6 inspections with 13 infractions recorded. The higher-risk findings here relate to: Pool and spa water quality and Food temperature control.
The number of infractions per inspection has stayed roughly the same over time.
What these findings mean
Health authorities word their findings differently, so we group them by what they mean for the people using the facility. Higher-risk findings are the ones that could directly cause illness or injury, such as water that is not properly treated.
Pool and spa water qualityHigher risk
For pools, spas and splash pads, inspectors test disinfectant levels, pH and water clarity, and check safety equipment. Water that is not properly treated can spread skin, ear and stomach infections.
Recorded 21 times across 14 separate inspections, most recently on October 6, 2026. For example:
Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
Food temperature controlHigher risk
Inspectors check that anything that has to be kept at a set temperature, such as chilled or hot food, or equipment like sterilizers, stays in its safe range and that accurate thermometers are on hand. With food, temperature problems are one of the most common causes of food poisoning.
Recorded 7 times across 7 separate inspections, most recently on July 2, 2026. For example:
Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
Food safety training and certificationLower risk
Many jurisdictions require trained pool operators and certified lifeguards. These findings mean required training, certification or staffing records were missing at the time of inspection.
Recorded 4 times across 4 separate inspections, most recently on November 18, 2024. For example:
Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
About this data
These results come from Alberta Health Services (Environmental Public Health), which inspects food premises and other public facilities in this area. We republish the authority's public disclosure data and refresh it regularly; the official record is the final word.
15 inspections
- Risk Management Inspection
0 infractions
- Monitoring Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- ** Missing floating weir gate in one of the skimmers.ACTION REQUIRED1) Install the missing skimmer floating weir gate to maximize surface skimming of the pool water.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Risk Management Inspection
2 infractions
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Turnover = 1,350gal/69gpm = 19.5 minutes- Filtration rate = 69gpm/4.9sq.ft = 14.1gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- **Missing tiles noted in the basin around the main drains and on the wall.Please replace the missing tiles.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
4 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Pseudomonas isolated from a sample submitted on June 17. Treatment and resampling required
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC isolated from a sample submitted on June 17. Treatment and resampling required
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Turnover = 1,350gal/69gpm = 19.5 minutes- Filtration rate = 69gpm/4.9sq.ft = 14.1gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- **Missing tiles noted in the basin around the main drains and on the wall.Please replace the missing tiles.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
2 infractions
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Turnover = 1,350gal/69gpm = 19.5 minutes- Filtration rate = 69gpm/4.9sq.ft = 14.1gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- **Missing tiles noted in the basin around the main drains and on the wall.Please replace the missing tiles.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
4 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Pseudomonas isolated from a sample collected in October 29
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC>57,000cfu isolated from a sample collected in October 29.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Turnover = 1,350gal/69gpm = 19.5 minutes- Filtration rate = 69gpm/4.9sq.ft = 14.1gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- **Missing tiles noted in the basin around the main drains and on the wall.Please replace the missing tiles.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
2 infractions
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Turnover = 1,350gal/69gpm = 19.5 minutes- Filtration rate = 69gpm/4.9sq.ft = 14.1gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- **Missing tiles noted in the basin around the main drains and on the wall.Please replace the missing tiles.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
4 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Pseudomonas isolated in a sample submitted on July 9/25
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- 450HPC in a sample submitted on July 9/25
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Turnover = 1,350gal/69gpm = 19.5 minutes- Filtration rate = 69gpm/4.9sq.ft = 14.1gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- **Missing tiles noted in the basin around the main drains and on the wall.Please replace the missing tiles.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Monitoring Inspection
2 infractions
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Turnover = 1,350gal/69gpm = 19.5 minutes- Filtration rate = 69gpm/4.9sq.ft = 14.1gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 14. Is the pool maintained in a clean and sanitary condition, good repair and are temperatures being properly regulated?
- **Missing tiles noted in the basin around the main drains and on the wall.Please replace the missing tiles.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. ACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. ACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Monitoring Inspection
2 infractions
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Filter surface area = 4.9sq.ft- Volume = 1350Gals- Flow rate = 60gpm**Turnover = 1350gal/60gpm = 22minutes.Filtration Rate = 60gpm/4.9sq.ft = 12.24gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize surface skimming of the pool water
- 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
- An anti-entrapment plan has been submitted, reviewed and deemed not to be in compliance. RECOMMENDED COMPLIANCE OPTIONS:1) Install unblockable covers OR2) Install a secondary anti-entrapment device such as:- A Safety Vacuum Release System (SVRS) or- An Automatic pump shut off system.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Risk Management Inspection
2 infractions
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Filter surface area = 4.9sq.ft- Volume = 1350Gals- Flow rate = 50-55gpm**Turnover = 1350gal/55gpm = 24minutes (inadequate turnover)Filtration Rate = 55gpm/4.9sq.ft = 11.22gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize skimming of the pool water2) Your turnover is inadequate. The turnover shall not exceed 20 minutes. To achieve the 20 minutes turnover, you will need to increase your flow rate 68gpm.
- 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
- An anti-entrapment plan has been submitted, reviewed and deemed not to be in compliance. The compliance options were recommended to the operator:1) Install an unblockable cover OR2) Install a secondary anti-entrapment device such as:- A Safety Vacuum Release System (SVRS) or- An Automatic pump shut off
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
3 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC present in a sample submitted on Oct 21. Operator to resample.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Filter surface area = 4.9sq.ft- Volume = 1350Gals- Flow rate = 50-55gpm**Turnover = 1350gal/55gpm = 24minutes (inadequate turnover)Filtration Rate = 55gpm/4.9sq.ft = 11.22gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize skimming of the pool water2) Your turnover is inadequate. The turnover shall not exceed 20 minutes. To achieve the 20 minutes turnover, you will need to increase your flow rate 68gpm.
- 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
- An anti-entrapment plan has been submitted, reviewed and deemed not to be in compliance. The compliance options were recommended to the operator:1) Install an unblockable cover OR2) Install a secondary anti-entrapment device such as:- A Safety Vacuum Release System (SVRS) or- An Automatic pump shut off
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
2 infractions
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- **Flappers/floating weirs missing from the skimmers. - Filter surface area = 4.9sq.ft- Volume = 1350Gals- Flow rate = 50-55gpm**Turnover = 1350gal/55gpm = 24minutes (inadequate turnover)Filtration Rate = 55gpm/4.9sq.ft = 11.22gpm/sq.ftACTION REQUIRED1) Install flappers/ floating weirs in the skimmers to maximize skimming of the pool water2) Your turnover is inadequate. The turnover shall not exceed 20 minutes. To achieve the 20 minutes turnover, you will need to increase your flow rate 68gpm.
- 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
- An anti-entrapment plan has been submitted, reviewed and deemed not to be in compliance. The compliance options were recommended to the operator:1) Install an unblockable cover OR2) Install a secondary anti-entrapment device such as:- A Safety Vacuum Release System (SVRS) or- An Automatic pump shut off
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
Nearby inspected facilities
- Hampton Inn & Suites - Suite Shop
3916 84 Avenue Leduc AB T9E 8M6
2 inspections
- Hampton Inn & Suites - Aquatic Common Area
3916 84 Avenue Leduc AB T9E 8M6
4 inspections
- Hampton Inn & Suites - Continental Breakfast
3916 84 Avenue Leduc AB T9E 8M6
5 inspections
- Hampton Inn & Suites - Swimming Pool
3916 84 Avenue Leduc AB T9E 8M6
10 inspections
- Hilton Garden Inn Edmonton International Airport - Aquatic Common Area
8208 36 Street Leduc AB T9E 2W9
8 inspections
- Hilton Garden Inn Edmonton International Airport - Food
8208 36 Street Leduc AB T9E 2W9
6 inspections
- Hilton Garden Inn Edmonton International Airport - Hot Tub
8208 36 Street Leduc AB T9E 2W9
25 inspections
- Hilton Garden Inn Edmonton International Airport - Swimming Pool
8208 36 Street Leduc AB T9E 2W9
25 inspections