Best Western Sunrise Inn & Suites - Swimming Pool/Water Slide
3101 43 Avenue Stony Plain AB T7Z 1L1 · Aquatic Facility
15 inspections
- Monitoring Inspection
0 infractions
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- This violation has been carried over from the previous report:The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Sept 17, 2024: Turnover period was calculated to be 7.36 hours based on a flow rate of 43gpm and a pool volume of 19000 gallons. Please consult your pool service provider to rectify this issue.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- The bacteriological water sample result taken April 21, 2026, came back unsatisfactory. PHI discussed treatment of the pool and submitting another water sample.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- This violation has been carried over from the previous report:The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Sept 17, 2024: Turnover period was calculated to be 7.36 hours based on a flow rate of 43gpm and a pool volume of 19000 gallons. Please consult your pool service provider to rectify this issue.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- This violation has been carried over from the previous report:The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Sept 17, 2024: Turnover period was calculated to be 7.36 hours based on a flow rate of 43gpm and a pool volume of 19000 gallons. Please consult your pool service provider to rectify this issue.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
2 infractions
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Water sample this week showed a presence of total coliforms.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- This violation has been carried over from the previous report:The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Sept 17, 2024: Turnover period was calculated to be 7.36 hours based on a flow rate of 43gpm and a pool volume of 19000 gallons. Please consult your pool service provider to rectify this issue.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- This violation has been carried over from the previous report:The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Sept 17, 2024: Turnover period was calculated to be 7.36 hours based on a flow rate of 43gpm and a pool volume of 19000 gallons. Please consult your pool service provider to rectify this issue.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Monitoring Inspection
2 infractions
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- This violation has been carried over from the previous report:The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Sept 17, 2024: Turnover period was calculated to be 7.36 hours based on a flow rate of 43gpm and a pool volume of 19000 gallons. Please consult your pool service provider to rectify this issue.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The water level was observed to be low in the swimming pool. The water level was increased immediately upon request. Ensure the water level is about half way up the skimmer to maximize water flow through the skimming devices.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC results this week (Aug 27) were elevated (130 CFU).
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Please consult your pool service provider to rectify this issue.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Please consult your pool service provider to rectify this issue.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC 600
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Please consult your pool service provider to rectify this issue.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
2 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC 600
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Please consult your pool service provider to rectify this issue.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
1 infraction
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours. Dec 08, 2023: Turnover period was calculated to be 6.2 hours based on the flow rate of 51USG/min and pool volume of 19000 USG.Please consult your pool service provider to rectify this issue.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- Monitoring Inspection
4 infractions
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count was measured at 230 CFU. Discussed this issue with the pool operator & treatment recommendations.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- The combined chlorine was measured to be at 1.79ppm.Please ensure combined chlorine is maintained at the lowest possible level.
- 07. Are the filtration, circulation and disinfection systems used to maintain water quality working properly (Non-Critical)?
- The swimming pool turnover period was calculated to be at 6.6 hours. Please note that for pools built after November 2006, the turnover period shall be maintained within 4 hours.
- 16. Are proper testing, monitoring, and other records being properly maintained?
- The observed testing and monitoring records for the pool does not contain Combined Chlorine readings. Please ensure Combined Chlorine is tested and recorded at least once a day.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count was measured at 230 CFU. Discussed this issue with the pool operator & treatment recommendations.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- HPC count this week measured at 2,220 CFU. Ensure the pool is treated and resampled.
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?