  1. Risk Management Inspection

    0 infractions

  2. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Heterotrophic Plate Count is 790 CFU per ml. Operator is advised to submit a re-sample immediately.
  3. Monitoring Inspection

    0 infractions

  4. Monitoring Inspection

    1 infraction

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • 1.The total alkalinity was observed to be 40ppm at the time of the inspection. Please ensure that the total alkalinity is between 60-180ppm at all times.2. The combined chlorine was observed to be 1.55ppm at the time of the inspection. Please ensure that the combined chlorine is maintained as low as possible at all times.
  5. Risk Management Inspection

    0 infractions

  6. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Total coliforms present in a sample collected on April 16/2025. The manager was directed to shock chlorinate the pool and resample after.
  7. Risk Management Inspection

    0 infractions

  8. Monitoring Inspection

    1 infraction

    • 17. Does the pool have adequate written policies, plans and posted rules and safety information to ensure that the pool is operating in a safe manner?
      • The anti-entrapment plan submitted was not accepted. The plan had some inaccurate information and missing supporting documents.The operator was directed to re-do the assessment and re-submit the anti-entrapment plan for review and approval.
  9. Risk Management Inspection

    2 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine was noted to be high (3.3 ppm). The operator was advised to backwash the pool, add water and balance the pool chemistry.
    • 12. Are the general safety devices and physical conditions in this pool providing a safe environment (Critical)?
      • According to the Anti-Entrapment Plan review conducted by this office, the main drain covers were expired. Please submit update anti-entrapment plans.
  10. Demand Inspection

    3 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • TC present in a sample submitted on October 23. Operator directed to shock chlorinate the pool.
    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine was noted to be high (3.3 ppm). The operator was advised to backwash the pool, add water and balance the pool chemistry.
    • 12. Are the general safety devices and physical conditions in this pool providing a safe environment (Critical)?
      • According to the Anti-Entrapment Plan review conducted by this office, the main drain covers were expired. Please submit update anti-entrapment plans.
  11. Monitoring Inspection

    2 infractions

    • 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
      • Combined chlorine was noted to be high (3.3 ppm). The operator was advised to backwash the pool, add water and balance the pool chemistry.
    • 12. Are the general safety devices and physical conditions in this pool providing a safe environment (Critical)?
      • According to the Anti-Entrapment Plan review conducted by this office, the main drain covers were expired. Please submit update anti-entrapment plans.