  1. Risk Management Inspection

    2 infractions

    • 20. Are indoor play areas and equipment sufficient and being properly maintained to ensure client safety (Non-Critical)?
      • Baby room block climber in disrepair. New climber has been ordered was insufficient. Provide picture once new one in place.
    • 24. Are sleeping supplies and areas sufficient to ensure client safety and comfort (Non-Critical)?
      • Tape on mattresses in disrepair. Ensure all mattresses are free from rips or cracking.
  2. Monitoring Inspection

    4 infractions

    • 06. Are proper protocols being followed in regards to client care?
      • Safety belts are required for diapering change stations.
    • 18. Is the facility and equipment being maintained in a suitable manner (Non-Critical)?
      • Ceiling tiles in OSC server area required replacement due to water damage. Repair cause of water damage and ceiling tilesTransition strip in baby room requires repair, remove tape once repaired.
    • 20. Are indoor play areas and equipment sufficient and being properly maintained to ensure client safety (Non-Critical)?
      • Baby room block climber in disrepair. Director outlined that new climber has been ordered. Provide picture once in place.
    • 24. Are sleeping supplies and areas sufficient to ensure client safety and comfort (Non-Critical)?
      • Ensure all mattresses are free from rips or cracking.
  3. Monitoring Inspection

    0 infractions

  4. Demand Inspection

    2 infractions

    • 08. Is this facility properly constructed (Non-Critical)?
      • Various surface areas of the walls throughout the facility were chipped, with peeling paint and required repair/repainting. Operator informed AHS that repainting of the daycare will be carried out asap.
    • 18. Is the facility and equipment being maintained in a suitable manner (Non-Critical)?
      • A few fluorescent light fixtures were burnt out and required replacement.
  5. Monitoring Inspection

    2 infractions

    • 08. Is this facility properly constructed (Non-Critical)?
      • Various surface areas of the walls throughout the facility were chipped, with peeling paint and required repair/repainting. Operator informed AHS that repainting of the daycare will be carried out asap.
    • 18. Is the facility and equipment being maintained in a suitable manner (Non-Critical)?
      • A few fluorescent light fixtures were burnt out and required replacement.