Skip to content
Loading map…

Peavine Inn and Suites - Swimming Pool

3905 51 Avenue High Prairie AB T0G 1E0 · Aquatic Facility

15 inspections

  1. Risk Management Inspection

    1 infraction

    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • Written logs of the pool's chemical parameters are not being recorded daily by the operators.Free available chlorine, pH, and combined chlorines must be manually tested for and documented each day the pool is operating.
  2. Monitoring Inspection

    2 infractions

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • A satisfactory bacteriological water sample has not been confirmed for the pool since April 4, 2025. Bacteriological water samples must be submitted weekly.
    • 16. Are proper testing, monitoring, and other records being properly maintained?
      • Written logs of the pool's chemical parameters are not being recorded daily by the operators.Free available chlorine, pH, and combined chlorines must be manually tested for and documented each day the pool is operating.
  3. Risk Management Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Bacteriological water results from samples collected on 22 January 2025 returned with an HPC count of 150 CFU/mLCorrection:- Verify pool parameters- Reference HPC pool protocol- Submit a resample
  4. Risk Management Inspection

    0 infractions

  5. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Bacteriological Sample results from September 4, 2024 returned with Heterotrophic Plate Count (HPC) of 290 CFU / mL.Ensure that the pool's bacteriological parameters do not exceed the allowable maximum.
  6. Monitoring Inspection

    0 infractions

  7. Risk Management Inspection

    0 infractions

  8. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Bacteriological Sample results from 24 January 2024 returned with HPC in excess of 57000 CFU / mLCorrection:- Close the swimming pool until HPC protocol can be conducted- Submit re-sample following HPC protocol- Consult PHI following the return of sample results
  9. Risk Management Inspection

    0 infractions

  10. Demand Inspection

    1 infraction

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • Bacteriological water sample results from samples collected on 3 January 2024 returned positive for the presence of total coliforms.Correction:- Review chemical parameters- Submit re-sample at earliest sample date- Begin Positive coliform procedure as attached
  11. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Sample results returned with HPC measuring 680Correction:- Submit re-sample- Maintain chemical parameters- Observe HPC protocol as required
  12. Monitoring Inspection

    0 infractions

  13. Risk Management Inspection

    0 infractions

  14. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • HPC of 130 was detectedCorrection:- Verify chemical pool parameters, adjust as required- Clean pool as required- Submit a satisfactory bacteriological pool sample
  15. Monitoring Inspection

    0 infractions