Skip to content
Loading map…

Pomeroy Inn & Suites - Swimming Pool

4111 51 Street Vermilion AB T9X 0B4 · Aquatic Facility

13 inspections

  1. Risk Management Inspection

    0 infractions

  2. Risk Management Inspection

    2 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • - Premise has had a recent sample with total coliforms present but no HPC (sample from November 12th positive for coliforms).- Discussed results with operator, will require further follow-up sampling.
    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • pH = 7.8 to 8.0 above required pool standards- Request that operator adjust treatment system for proper pool pH balance.- Free Chlorine = 3.49 mg/L- Combined Chlorine = 0.42 mg/L
  3. Demand Inspection

    2 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • - Premise has had a recent sample with total coliforms present but no HPC (sample from November 12th positive for coliforms).- Discussed results with operator, will require further follow-up sampling.
    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • pH = 7.8 to 8.0 above required pool standards- Request that operator adjust treatment system for proper pool pH balance.
  4. Demand Inspection

    2 infractions

    • 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
      • - Premise has had a recent sample with total coliforms present but no HPC.- Discussed results with operator, showed sample results. Will require further follow-up sampling.
    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • pH = 7.7 to 7.8 above required pool standards- Request that operator adjust treatment system for proper pool pH balance.- Free Chlorine = 0.95 to 1.0 mg/L- Total Chlorine = verified (3 tests) highest result 1.7 mg/L- Combined Chlorine up to 0.69 mg/L
  5. Risk Management Inspection

    0 infractions

  6. Risk Management Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • Note: tested for pH only at this time.pH= 7.9 to 8.0 mg/L (still HIGH)- Discussed concern pertaining to high pH reading with site manager at this time, Directed them to treat pool, reduce pH to acceptable level.
  7. Monitoring Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • - Free Cl = 4.23 mg/L- Combined Cl = 0.34 mg/L- pH = 8.1 mg/L (HIGH)- Discussed concern pertaining to high pH reading with site manager present at this time, Directed them to treat pool, reduce pH to acceptable level.
  8. Monitoring Inspection

    0 infractions

  9. Risk Management Inspection

    0 infractions

  10. Monitoring Inspection

    1 infraction

    • 04. Is the chemical quality of the water in this pool satisfactory (Critical)?
      • pH = 7.7 to 7.8 elevatedChlorine Free = 7.0 mg/LCombined Chlorine = 0.5 mg/L- Request that operators look at adjusting the chlorine residual and pH, recommend reviewing the saturation index for this water body.
  11. Demand Inspection

    0 infractions

  12. Demand Inspection

    1 infraction

    • 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
      • Heterotrophic Plate Count (HPC) of 150 is over the maximum acceptable limit of 100 - as per section 6.1(a) of the Alberta Health Pool Standards. Ideally, the HPC levels should be less than 10.No immediate action required now but continue to submit weekly water samples and monitor future levels of HPC.
  13. Monitoring Inspection

    0 infractions