Skip to content
Loading map…

Aida's Donair

47 High Street SE Calgary AB T2Z 3T8 · Food - General

4 inspections

  1. Risk Management Inspection

    0 infractions

  2. Monitoring Inspection

    1 infraction

    • 11. Are there adequate and properly operating dish washing facilities to effectively clean and sanitize equipment and utensils (unless noted elsewhere)(Critical)?
      • Unable to do dishes as the plumbing has been disconnected from the grease trap due to a sewage back up. **All food is served in single use wrap. no reusable customer dishes/utensils. **No dishwashing can be done until a plumber is onsite to remediate the issue. Multiple tongs/knives to use until repair is complete.
  3. Monitoring Inspection

    0 infractions

  4. Monitoring Inspection

    4 infractions

    • 10. Are food temperatures during storage and processing being controlled to maximize food safety?
      • Front area sandwich cooler's internal temperature was 8 degrees Celsius.Adjust or service unit to ensure foods are maintained at 4 degrees Celsius or less.
    • 21. Is the facility properly constructed and maintained in a state of good repair to allow for the safe and sanitary handling of food?
      • Update March 14, 2024:- Previously noted items have not yet been addressed.Update May 30, 2023:- Previously noted areas still need repairs. - Operator has stated plans are in place for repairs to be done by next week.Shelf used to hold microwave is broken / damaged.Some broken wall tiles present.- All surfaces must be smooth, easily cleanable and in good repair.- Repair / replace as needed.
    • 21. Is the facility properly constructed and maintained in a state of good repair to allow for the safe and sanitary handling of food?
      • White plastic film and tape present on new stainless-steel table in back kitchen area.Remove protective film and tape.Surfaces must be smooth and easy to clean.
    • 22. Are utensils and equipment maintained in a condition and a manner that ensures the safe handling of food?
      • Update March 14, 2024:- Previously noted issue remains.Tape and residue along the lid of the chest freezer in the back prep room.- Please do not use sticky tape to make repairs on equipment. Ensure surfaces are smooth, non-absorbent, and easily cleanable.- Operator has stated a plan is in place to replace the chest freezer and is being shipped and will arrive between 1-2 weeks.