Canalta Rocky Mountain House - Swimming Pool
4406 41 Avenue Rocky Mountain House AB T4T 1J6 · Aquatic Facility
12 inspections
- Monitoring Inspection
1 infraction
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Alkalinity was measured at 30 ppm.The pool operator corrected the alkalinity during the inspection by adding alkalinity increaser. After allowing the water to circulate and mix, the alkalinity was remeasured at 61 ppm.Combined chlorine was measured at 0.10 ppm.
- 05. Is the chemical quality of the water in this pool satisfactory (Non-Critical)?
- Risk Management Inspection
0 infractions
- Demand Inspection
1 infraction
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Unsatisfactory water sample result:Total coliforms - ABSENTHPC - 270 cfu/100mL *unsatisfactorySample collected June 17, 2026 by Pool Operator Hugh C.Pool Operator Hugh C. indicated the pool will be shock chlorinated during the facility shutdown. Following shock chlorination and rebalancing of the pool water, a repeat sample will be collected and submitted for analysis.
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
0 infractions
- Risk Management Inspection
0 infractions
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Sample results for 21Jan2026:Heterotrophic plate count = 900 cfu/mLTotal coliforms = Absent*** Pool is Closed. Super-chlorination is in process. Resample. ***
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
1 infraction
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Analytical sample results for sample taken on 7Jan2026 indicate the presence of Total coliform bacteria.On-site inspection completed and chemistry records reviewed. Pool chemistry at the time of the inspection was within acceptable ranges.*** Please resample next week. ***
- 02. Is the bacteriological quality of the water in this pool satisfactory (Critical)?
- Risk Management Inspection
0 infractions
- Monitoring Inspection
1 infraction
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Alterations were made to the disinfection system without approval. Please provide plans, specification and all relevant information to our office for review and records.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Monitoring Inspection
1 infraction
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Alterations were made to the disinfection system without approval. Please provide plans, specification and all relevant information to our office for review and records.
- 18. Have plans for construction, renovations or alteration for the pool been submitted for written approval?
- Demand Inspection
1 infraction
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Sample results for 25Sept2024:Heterotrophic plate count = >57,000 cfu/mL (estimated)Total coliforms = Absent*** Pool is Closed. Super-chlorination is in process. Resample. ***
- 03. Is the bacteriological quality of the water in this pool satisfactory (Non-Critical)?
- Monitoring Inspection
0 infractions